When a permit is required
Permit triggers and exempt work for Levan
Building permits are required for construction, additions, alterations, and changes of use within Levan Town limits per Utah code and local ordinance. Exact thresholds (structure size, valuation) should be confirmed directly with the town office, as specific local exemption thresholds were not confirmed in publicly indexed sources.
- Exempt Standard Utah IRC exemptions (one-story detached accessory structures 200 sq. ft. or less; ordinary repairs; painting and finish work; fences under 7 ft.; retaining walls under 4 ft. from footing) likely apply as the default baseline
Note: Confirm specific local exemption thresholds with the town at (435) 623-1959 before relying on any exemption. Electrical, plumbing, and mechanical work within any structure requires applicable trade permits regardless of the structure's building permit status.
- Completed building permit application
- Site plan
- Construction drawings appropriate to project type
- Property owner information
- Contractor license information (if applicable)
- Contact the Town Office at (435) 623-1959 or levantown@gmail.com for the current complete list of required documents
- Building code
- Utah statewide 2021 International Building Code (IBC), 2021 International Residential Code (IRC), 2021 International Mechanical Code (IMC), 2021 International Plumbing Code (IPC), 2021 International Energy Conservation Code (IECC), and current National Electrical Code (NEC) under Utah Code Title 15A.
- Permit validity
- Standard Utah 180-day commencement and 180-day suspension rules apply under the adopted building codes; confirm with the town for any local variations.
- Owner-builder
- Utah statewide owner-builder exemption applies. The town registers the owner-builder with DOPL at permit issuance.
- Contractor requirements
- Utah DOPL state contractor license required for work valued at $3,000 or more. Trade contractors must hold applicable Utah specialty licenses.
Application process
Typical processing: Not explicitly published. Approval timelines depend on Town Council meeting schedule and the complexity of the project. Contact the town at (435) 623-1959 for an estimate.
- 01 Contact the Levan Town Office at (435) 623-1959 or levantown@gmail.com to confirm what permits are required for the project.
- 02 Obtain the applicable permit application form(s) from the Town Office.
- 03 Complete the permit application with project details, property description, and construction information.
- 04 Prepare required supporting documents (site plan, construction plans as appropriate to project type and size).
- 05 Submit the completed application and supporting documents to the Town Office in person or by mail.
- 06 Contact Heather Taylor (Planning and Zoning contact) at (435) 623-1959 for submission requirements and instructions.
- 07 The permit may be reviewed and approved by the Town Council at a regular Town Council meeting (held at the Levan Town Hall, 20 North Main, Levan, UT at 7:00 PM; contact the town for the current meeting schedule).
- 08 Pay applicable permit fees upon approval.
- 09 Receive the permit and post it on-site before commencing work.
- 10 Schedule required inspections with the town. The town may use a county or contracted inspector; confirm inspection scheduling with the town office at permit issuance.
- 11 Obtain final inspection and certificate of occupancy before occupying any new structure.
Typical processing time: Not explicitly published. Approval timelines depend on Town Council meeting schedule and the complexity of the project. Contact the town at (435) 623-1959 for an estimate.
Fee schedule
Levan building permit fees
Contact Levan Town Office at (435) 623-1959 or levantown@gmail.com for current fee schedule and acceptable payment methods.
Required inspections
Scheduling and sequence
- (435) 623-1959 (phone)
- levantown@gmail.com (email)
- Inspection hours
- Contact the Levan Town Office for inspector hours and availability.
Typical sequence: Standard Utah residential sequence (footing, framing, rough-in trades, insulation, final) applies; confirm with the town.
Frequently asked
Common questions about Levan permits
01 Do I need a building permit in Levan, UT? ▸
02 How much does a building permit cost in Levan, UT? ▸
03 How do I apply for a building permit in Levan, UT? ▸
04 How long does it take to get a building permit in Levan, UT? ▸
05 What work is exempt from building permits in Levan, UT? ▸
06 How do I schedule a building inspection in Levan, UT? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Levan Office / Planning and Zoning before applying. Jaspector is not legal advice.