Town of Levan

How to apply for a building permit in Town of Levan, Utah. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Town of Levan Office / Planning and Zoning

Street address
20 North Main Street, Levan, UT 84639
Coverage
All properties within the incorporated Town of Levan limits. Levan is a small incorporated town in Juab County where building permits and planning and zoning matters are handled through the Town Office and Town Council. Building inspections may be contracted through Juab County or another inspector arrangement.
Online portal
Levan Town Hall
Paper/in-person process
§ 02

When a permit is required

Permit triggers and exempt work for Levan

Building permits are required for construction, additions, alterations, and changes of use within Levan Town limits per Utah code and local ordinance. Exact thresholds (structure size, valuation) should be confirmed directly with the town office, as specific local exemption thresholds were not confirmed in publicly indexed sources.

Standard Utah IRC exemptions (one-story detached accessory structures 200 sq. ft. or less; ordinary repairs; painting and finish work; fences under 7 ft.; retaining walls under 4 ft. from footing) likely apply as the default baseline
  • Exempt Standard Utah IRC exemptions (one-story detached accessory structures 200 sq. ft. or less; ordinary repairs; painting and finish work; fences under 7 ft.; retaining walls under 4 ft. from footing) likely apply as the default baseline

Note: Confirm specific local exemption thresholds with the town at (435) 623-1959 before relying on any exemption. Electrical, plumbing, and mechanical work within any structure requires applicable trade permits regardless of the structure's building permit status.

Required documents
  • Completed building permit application
  • Site plan
  • Construction drawings appropriate to project type
  • Property owner information
  • Contractor license information (if applicable)
  • Contact the Town Office at (435) 623-1959 or levantown@gmail.com for the current complete list of required documents
Building code
Utah statewide 2021 International Building Code (IBC), 2021 International Residential Code (IRC), 2021 International Mechanical Code (IMC), 2021 International Plumbing Code (IPC), 2021 International Energy Conservation Code (IECC), and current National Electrical Code (NEC) under Utah Code Title 15A.
Permit validity
Standard Utah 180-day commencement and 180-day suspension rules apply under the adopted building codes; confirm with the town for any local variations.
Owner-builder
Utah statewide owner-builder exemption applies. The town registers the owner-builder with DOPL at permit issuance.
Contractor requirements
Utah DOPL state contractor license required for work valued at $3,000 or more. Trade contractors must hold applicable Utah specialty licenses.

Source: Town of Levan Office / Planning and Zoning ↗

§ 03

Application process

Typical processing: Not explicitly published. Approval timelines depend on Town Council meeting schedule and the complexity of the project. Contact the town at (435) 623-1959 for an estimate.

  1. 01
    Contact the Levan Town Office at (435) 623-1959 or levantown@gmail.com to confirm what permits are required for the project.
  2. 02
    Obtain the applicable permit application form(s) from the Town Office.
  3. 03
    Complete the permit application with project details, property description, and construction information.
  4. 04
    Prepare required supporting documents (site plan, construction plans as appropriate to project type and size).
  5. 05
    Submit the completed application and supporting documents to the Town Office in person or by mail.
  6. 06
    Contact Heather Taylor (Planning and Zoning contact) at (435) 623-1959 for submission requirements and instructions.
  7. 07
    The permit may be reviewed and approved by the Town Council at a regular Town Council meeting (held at the Levan Town Hall, 20 North Main, Levan, UT at 7:00 PM; contact the town for the current meeting schedule).
  8. 08
    Pay applicable permit fees upon approval.
  9. 09
    Receive the permit and post it on-site before commencing work.
  10. 10
    Schedule required inspections with the town. The town may use a county or contracted inspector; confirm inspection scheduling with the town office at permit issuance.
  11. 11
    Obtain final inspection and certificate of occupancy before occupying any new structure.

Typical processing time: Not explicitly published. Approval timelines depend on Town Council meeting schedule and the complexity of the project. Contact the town at (435) 623-1959 for an estimate.

Source: Town of Levan Office / Planning and Zoning ↗

§ 04

Fee schedule

Levan building permit fees

Fee type
Amount
01
Permit fee formula
Not confirmed from publicly available sources (contact Levan Town for current fees)

Contact Levan Town Office at (435) 623-1959 or levantown@gmail.com for current fee schedule and acceptable payment methods.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (435) 623-1959 (phone)
  • levantown@gmail.com (email)
Inspection hours
Contact the Levan Town Office for inspector hours and availability.

Typical sequence: Standard Utah residential sequence (footing, framing, rough-in trades, insulation, final) applies; confirm with the town.

Source: Town of Levan Office / Planning and Zoning ↗

§ 06

Frequently asked

Common questions about Levan permits

01 Do I need a building permit in Levan, UT?
Building permits are required for construction, additions, alterations, and changes of use within Levan Town limits per Utah code and local ordinance. Exact thresholds (structure size, valuation) should be confirmed directly with the town office, as specific local exemption thresholds were not confirmed in publicly indexed sources.
02 How much does a building permit cost in Levan, UT?
Building permit fees in Levan, UT are set by the local building department and vary by project type and valuation. Fees are calculated as: Not confirmed from publicly available sources (contact Levan Town for current fees).
03 How do I apply for a building permit in Levan, UT?
To apply for a building permit in Levan, UT, follow these steps: 1. Contact the Levan Town Office at (435) 623-1959 or levantown@gmail.com to confirm what permits are required for the project. 2. Obtain the applicable permit application form(s) from the Town Office. 3. Complete the permit application with project details, property description, and construction information. 4. Prepare required supporting documents (site plan, construction plans as appropriate to project type and size). 5. Submit the completed application and supporting documents to the Town Office in person or by mail. 6. Contact Heather Taylor (Planning and Zoning contact) at (435) 623-1959 for submission requirements and instructions. 7. The permit may be reviewed and approved by the Town Council at a regular Town Council meeting (held at the Levan Town Hall, 20 North Main, Levan, UT at 7:00 PM; contact the town for the current meeting schedule). 8. Pay applicable permit fees upon approval. 9. Receive the permit and post it on-site before commencing work. 10. Schedule required inspections with the town. The town may use a county or contracted inspector; confirm inspection scheduling with the town office at permit issuance. 11. Obtain final inspection and certificate of occupancy before occupying any new structure.
04 How long does it take to get a building permit in Levan, UT?
Building permit processing times in Levan, UT typically run Not explicitly published. Approval timelines depend on Town Council meeting schedule and the complexity of the project. Contact the town at (435) 623-1959 for an estimate.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Levan, UT?
Not all construction work requires a permit in Levan, UT. The following work is generally exempt: Standard Utah IRC exemptions (one-story detached accessory structures 200 sq. ft. or less; ordinary repairs; painting and finish work; fences under 7 ft.; retaining walls under 4 ft. from footing) likely apply as the default baseline. Note: Confirm specific local exemption thresholds with the town at (435) 623-1959 before relying on any exemption. Electrical, plumbing, and mechanical work within any structure requires applicable trade permits regardless of the structure's building permit status. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Levan, UT?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Levan, UT via: (435) 623-1959, levantown@gmail.com.
last verified April 2026 source Town of Levan Office / Planning and Zoning ↗ entry id permits/utah/juab/levan

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Levan Office / Planning and Zoning before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Juab County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Juab County jurisdictions →