When a permit is required
Permit triggers and exempt work for Hanahan
Hanahan states permits are required for building, pool, electrical, plumbing, mechanical, and gas construction, reconstruction, alteration, and repairs.
Note: Hanahan permits page links to a 'List of Work Exempt from Permits' document, but the indexed public text reviewed did not surface the itemized list. Because the exemption list is not readable in the currently indexed text, treat exempt-work data as thin and confirm with Building and Codes before relying on any exemption.
- Permit application
- Contractor and owner information
- Contractor email
- Business license number
- SC LLR number and expiration
- Contract copy
- Plans and trade details
- Flood and zoning review items as applicable
- Building code
- 2021 IBC, IRC, plumbing, mechanical, fuel gas, and fire prevention codes with South Carolina amendments; 2020 NEC with SC amendments; 2017 A117.1; floodplain and Berkeley County stormwater compliance
- Permit validity
- The city permit application states the permit becomes invalid unless work begins within six months after issuance, or if work is suspended or abandoned for six months after commencement.
- Owner-builder
- Hanahan owner-builder disclosure follows SC Code Section 40-59-260. Owner-builders must file the disclosure with the Register of Deeds, supervise construction themselves, build only for their own use and occupancy, avoid sale or rental within two years, and ensure hired trades are properly licensed.
- Contractor requirements
- Hanahan states contractors must hold a South Carolina contractor license, a City of Hanahan business license for any type of construction, and submit a copy of the contract. Licenses are verified before permit issuance.
Application process
Typical processing: No public review-time estimate located in current Hanahan pages reviewed.
- 01 Start an application in the GovPossible portal or use the city permit application form for supporting information.
- 02 Upload or submit the permit application with project details, contractor information, business license information, SC LLR license information, and project cost.
- 03 Provide required plans and supporting documents; the permit page states review is for building, residential, plumbing, mechanical, fuel gas, fire prevention, electrical, accessibility, floodplain, and Berkeley County stormwater compliance.
- 04 Staff verifies licenses, contract copy, zoning, fire, and flood items as applicable.
- 05 Permit is issued after review and fees; inspections are then scheduled through GovPossible or by phone.
Typical processing time: No public review-time estimate located in current Hanahan pages reviewed.
Fee schedule
Hanahan building permit fees
Confirm current amount tables directly from the posted Building Permit Fee Schedule before filing.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- GovPossible portal (online)
- 843-576-5259 (phone)
- Scheduling deadline
- Call before 3:00 PM for next-business-day scheduling
- Inspection hours
- Monday through Friday, 8:30 AM to 5:00 PM
Typical sequence: Head contractor requests inspections as project phases are ready; city does not publish a consolidated sequence on the indexed public page reviewed.
Frequently asked
Common questions about Hanahan permits
01 Do I need a building permit in Hanahan, SC? ▸
02 How much does a building permit cost in Hanahan, SC? ▸
03 How do I apply for a building permit in Hanahan, SC? ▸
04 How long does it take to get a building permit in Hanahan, SC? ▸
05 How do I schedule a building inspection in Hanahan, SC? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Hanahan Building and Codes Department before applying. Jaspector is not legal advice.