When a permit is required
Permit triggers and exempt work for Spring Garden Township
Building permits apply to UCC work requiring inspections, including additions, structural renovations, demolition, attached garages, fences over 6 feet, retaining walls over 4 feet, deck over 30 inches high, pools over 24 inches deep, doors/windows of different size or location, most electrical work, plumbing changes, HVAC replacement, commercial and industrial remodeling, business signs, and change of use/occupancy
Note: Spring Garden distinguishes between work needing a building permit and work still needing a zoning permit, so applicants should not assume 'no building permit' means 'no permit at all'
- Permit application
- Site plan or site diagram
- Stormwater management permit application when impervious-surface triggers apply
- Plans or materials required by Code Administrators
- Building code
- Pennsylvania Uniform Construction Code administered locally with third-party UCC review and inspection services
- Contractor requirements
- Township fee schedule includes local plumbing licenses and plumbing permit fees; Pennsylvania HICPA registration still applies where required
Application process
Application → plan check → issuance → inspection → final
- 01 Determine whether the job needs a building permit, zoning permit, and/or stormwater management permit from the Township's permit matrix.
- 02 Complete the applicable building or zoning permit application and prepare a site diagram and any stormwater materials if new impervious area is proposed.
- 03 Submit the application package to the Township; UCC-regulated work is reviewed through Code Administrators.
- 04 Pay the separate Code Administrators QuickBooks invoice for plan review and inspection fees once review is complete.
- 05 Pay Township fees at permit pickup and receive the permit.
- 06 Schedule required inspections through Code Administrators.
Fee schedule
Spring Garden Township building permit fees
Fees are not due up front; Code Administrators invoices plan review and inspection fees separately by email through QuickBooks, and Township fees are due at permit pickup
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Code Administrators (phone)
Typical sequence: Project-specific UCC inspections through Code Administrators after permit issuance
Frequently asked
Common questions about Spring Garden Township permits
01 Do I need a building permit in Spring Garden Township, PA? ▸
02 How much does a building permit cost in Spring Garden Township, PA? ▸
03 How do I apply for a building permit in Spring Garden Township, PA? ▸
04 How do I schedule a building inspection in Spring Garden Township, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Spring Garden Township, Planning and Zoning / Building Permits; UCC review and inspections by Code Administrators, Inc. before applying. Jaspector is not legal advice.