When a permit is required
Permit triggers and exempt work for Hanover
Hanover states building permits are required for residential and commercial new construction, remodels and renovations involving structural change, electrical or plumbing work, ADA-triggering work, changes to ingress/egress, fire alarm or extinguishing system changes, additions or expansions, accessory structures 1,000 square feet or over, and accessory structures with electrical or plumbing
- Electronic application
- Required uploads listed in the iWorQ application
- Plans and stormwater materials as applicable
- Outside approvals required by the project
- Building code
- Pennsylvania Uniform Construction Code with third-party UCC review and inspection services
- Contractor requirements
- Borough contracting structure does not replace Pennsylvania HICPA obligations; trade and third-party UCC review requirements still apply
Application process
Typical processing: Borough policy says the contracted third-party review process can take anywhere from 4 to 6 weeks depending on project nature
- 01 Review Hanover's permitting policy before submitting an application.
- 02 Submit the permit application electronically through the iWorQ portal, including all required uploads and electronic signature.
- 03 Include any stormwater management materials and outside approvals if the project disturbs 500 square feet or more or 5,000 square feet or more as outlined by the Borough.
- 04 Borough staff and the contracted third-party UCC reviewer inspect and review the submittal.
- 05 Pay the invoice, including Borough permit fees and any third-party review and inspection charges.
- 06 Pick up or finalize issuance of the permit through DCE and complete inspections before use or occupancy.
Typical processing time: Borough policy says the contracted third-party review process can take anywhere from 4 to 6 weeks depending on project nature
Source: Borough of Hanover, Department of Code Enforcement ↗
Fee schedule
Effective January 1, 2026
DCE states permit payment and issuance hours are Tuesdays and Fridays from 9:00 a.m. to 3:30 p.m., unless other arrangements are approved
Fees change periodically. Confirm at the official fee schedule ↗ (effective January 1, 2026) before budgeting.
Required inspections
Scheduling and sequence
- Through Hanover DCE and its contracted third-party reviewer/inspector after permit issuance (other)
- Inspection hours
- Permit payment and pickup: Tuesdays and Fridays from 9:00 a.m. to 3:30 p.m.
Typical sequence: Application through iWorQ, third-party review, permit issuance, required inspections, then final approval and occupancy/use clearance
Source: Borough of Hanover, Department of Code Enforcement ↗
Frequently asked
Common questions about Hanover permits
01 Do I need a building permit in Hanover, PA? ▸
02 How much does a building permit cost in Hanover, PA? ▸
03 How do I apply for a building permit in Hanover, PA? ▸
04 How long does it take to get a building permit in Hanover, PA? ▸
05 How do I schedule a building inspection in Hanover, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Borough of Hanover, Department of Code Enforcement before applying. Jaspector is not legal advice.