When a permit is required
Permit triggers and exempt work for Kingston Borough
Kingston states zoning permits are required before buildings, structures, signs, steps, decks, sheds, pools, fences, and replacement of these items; building permit categories on the borough form include demolition, decks, pools, electrical, plumbing, mechanical, repair, and changes in occupancy
Note: Kingston does not post a separate local permit-exemption list on its permit page. Pennsylvania UCC exemptions are the best published baseline, including small fences, low retaining walls without surcharge, shallow prefabricated pools, low uncovered decks, qualifying awnings, communications wiring, and ordinary repairs that do not affect structure, egress, or system relocations.
- Building or zoning application
- Plot or site plan
- Owner or applicant information
- Project description
- Cost
- Additional nonconformance filing when applicable
- Building code
- Pennsylvania UCC, with current statewide update effective January 1, 2026
- Permit validity
- Not publicly posted by the borough; Pennsylvania UCC default invalidation and extension framework applies
- Owner-builder
- The building permit form allows applications by the owner, lessee, agent, or registered design professional
- Contractor requirements
- Borough fee schedule includes a contractor license; Pennsylvania HICPA registration still applies for covered home improvement work
Application process
Typical processing: Zoning application states processing may take up to 30 days
- 01 Determine whether both zoning and building approval are needed; the borough ordinance reminders state zoning permits are needed before structures, signs, and many accessory items are erected, moved, or altered.
- 02 Complete the zoning permit application and, where applicable, the building permit application.
- 03 Submit the required plot plan, owner and applicant details, cost, and supporting documentation.
- 04 Pay the zoning or permit fees at submission.
- 05 Await zoning review and any building or code review by the borough and BHW.
- 06 After issuance, proceed with work and required inspections.
Typical processing time: Zoning application states processing may take up to 30 days
Fee schedule
Kingston Borough building permit fees
The public fee schedule does not note card-processing rules
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Borough and BHW Construction Consultation Services (in-person)
- Inspection hours
- Borough business hours are 8:30 a.m. to 4:30 p.m.
Typical sequence: Project-specific; no public borough sequence was posted
Frequently asked
Common questions about Kingston Borough permits
01 Do I need a building permit in Kingston Borough, PA? ▸
02 How much does a building permit cost in Kingston Borough, PA? ▸
03 How do I apply for a building permit in Kingston Borough, PA? ▸
04 How long does it take to get a building permit in Kingston Borough, PA? ▸
05 How do I schedule a building inspection in Kingston Borough, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Kingston Borough Code Enforcement and Zoning Office, with BHW Construction Consultation Services as Building Inspector before applying. Jaspector is not legal advice.