When a permit is required
Permit triggers and exempt work for Media
Constructing or altering a structure, additions including decks, demolition or moving of structures, change of occupancy, regulated equipment installation or alteration, and lot line moves affecting existing structures.
- Exempt Ordinary repairs such as new gutters
- Exempt Painting
- Exempt Replacement windows where the existing opening is not altered
Note: Borough publishes examples of ordinary repairs rather than a full standalone exemption code table.
- Completed building or trade application
- e-Collect Plus registration where required
- Certificate of insurance naming Media Borough
- Plumber registration for plumbing work
- Electrical permit application for electrical work
- Building code
- Pennsylvania UCC as administered by Borough code enforcement
- Contractor requirements
- Plumbers must be licensed in the Borough with annual registration; contractors must be registered with e-Collect Plus; electricians must show licensure from the community where licensed.
Application process
Typical processing: No general turnaround posted; inspections require at least 24 hours notice
- 01 Determine whether the proposed work requires a permit under the Borough's permit-required list.
- 02 Register with e-Collect Plus if required and assemble insurance and application materials.
- 03 Submit the Building/Zoning Permit Application or trade-specific form with supporting documents and fees.
- 04 Schedule mandatory progress inspections with at least 24 hours notice.
- 05 Complete final inspection and obtain occupancy approval where applicable.
Typical processing time: No general turnaround posted; inspections require at least 24 hours notice
Fee schedule
Effective January 2025
Additional $4.50 UCC fee applies to each construction or building permit
Fees change periodically. Confirm at the official fee schedule ↗ (effective January 2025) before budgeting.
Required inspections
Scheduling and sequence
- 610-566-5210 ext. 247 (phone)
- Scheduling deadline
- At least 24 hours in advance
- Time windows
- 24-hour advance scheduling notice is posted; specific inspection windows are not posted
Typical sequence: Footings, foundation/slab, masonry, rough frame, rough plumbing/mechanical/electrical, insulation, sheetrock, final
Frequently asked
Common questions about Media permits
01 Do I need a building permit in Media, PA? ▸
02 How much does a building permit cost in Media, PA? ▸
03 How do I apply for a building permit in Media, PA? ▸
04 How long does it take to get a building permit in Media, PA? ▸
05 What work is exempt from building permits in Media, PA? ▸
06 How do I schedule a building inspection in Media, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Media Borough Code Enforcement Department before applying. Jaspector is not legal advice.