On this page 6
When a permit is required
Permit triggers and exempt work for Chester
The Township application covers building, plumbing, electrical, and mechanical work, including alterations, repairs, fences, and demolition.
- Exempt Ordinary repairs under the Pennsylvania UCC
Note: Public-facing Township sources reviewed do not publish a standalone exempt-work list.
- Site sketch with setbacks
- Contractor license number
- Proof of public liability
- Proof of workers compensation or release form
- Contractor proposal
- Detailed drawing or print
- Material list for additions/decks/fences
- Building code
- Permit application references the Pennsylvania construction code framework through local permit administration
- Owner-builder
- Workers compensation release form is accepted where applicable.
- Contractor requirements
- Contractor license number is required with proof of insurance documentation.
Application process
Typical processing: Allow 3 days for Township review and approval for additions, decks, and fences
- 01 Download and complete the Building, Plumbing, Electrical, Mechanical Application.
- 02 Prepare site sketch showing house and outbuildings with dimensions to property lines.
- 03 Submit contractor license number, liability and workers compensation proof or release form, contractor proposal, and any detailed drawings or material lists for additions, decks, and fences.
- 04 Obtain all applicable trade permits at the same time as the building permit.
- 05 Allow Township review and obtain approval before starting work.
Typical processing time: Allow 3 days for Township review and approval for additions, decks, and fences
Source: Township of Chester permit intake through Township Office ↗
Fee schedule
Effective 2025
Application notes a $4.50 state fee required on all permits
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2025) before budgeting.
Required inspections
Scheduling and sequence
- Through Township after permit issuance (phone)
- Inspection hours
- Monday through Friday, 8:00 AM to 4:00 PM
Typical sequence: Scope-specific inspections are implied by permit type; all applicable trade permits must be taken out together
Frequently asked
Common questions about Chester permits
01 Do I need a building permit in Chester, PA? ▸
02 How much does a building permit cost in Chester, PA? ▸
03 How do I apply for a building permit in Chester, PA? ▸
04 How long does it take to get a building permit in Chester, PA? ▸
05 What work is exempt from building permits in Chester, PA? ▸
06 How do I schedule a building inspection in Chester, PA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Township of Chester permit intake through Township Office before applying. Jaspector is not legal advice.