When a permit is required
Permit triggers and exempt work for Dayville
A building permit is required for all new construction and all structural alterations within the City of Dayville. Oregon law requires permits for all new residential structures.
- Exempt Non-habitable accessory structures: detached storage sheds, garages, or similar structures; one-story only; less than 200 square feet; less than 15 feet floor to average roof height.
- Exempt Patio, porch & deck covers: not more than 200 square feet; not more than 12 feet average roof height; not closer than 3 feet to property line.
- Exempt Decks: deck floor or platform not more than 30 inches above adjacent grade at any point; must meet setback and construction standards.
- Exempt Fencing: non-permanent fencing (wood, wire mesh, or chain link); less than 7 feet in height.
- Exempt Finish work & minor repairs: paint, paper, tile, or similar finishes on walls, floors, ceilings; carpet, cabinets, countertops, or similar materials; repairs/replacements of sink, toilet, faucet (not concealed in walls), countertops, shower heads, gutters, downspouts.
Note: Any work not meeting ALL parameters of an exemption requires a full building permit.
- Completed permit application
- Property description and owner information
- Project scope and construction details
- Architectural/construction plans
- Site plan
- Building code
- 2023 Oregon Residential Specialty Code (ORSC) and 2022 Oregon Structural Specialty Code (OSSC)
- Permit validity
- Permit valid for construction start within 180 days of issuance. Permits expire if work suspended or abandoned for 180+ days.
- Contractor requirements
- All construction contractors must hold a current Oregon Construction Contractors Board (CCB) license.
Application process
Typical processing: Varies by project complexity; initial review typically 2-4 weeks.
- 01 Contact Grant County Planning & Development Department at 541-575-1519 for pre-permit consultation.
- 02 Verify whether project requires land use review or other local approvals.
- 03 Complete permit application and obtain forms from BuildingPermits.Oregon.gov or in-person.
- 04 Provide complete property description, owner information, project scope, and construction details.
- 05 Include architectural/construction plans appropriate to project scope and complexity.
- 06 Submit application and required documents online via BuildingPermits.Oregon.gov or in-person.
- 07 Plans reviewed for compliance with Oregon Residential Specialty Code (ORSC) and Oregon Structural Specialty Code (OSSC).
- 08 Permit is issued once approved. Permit valid for construction start within 180 days of issuance.
- 09 Schedule inspections by appointment: contact 541-575-1519. Inspections conducted every Tuesday.
- 10 Work must pass all required inspections (foundation, framing, electrical, plumbing, final).
- 11 Final approval and sign-off issued upon completion of all inspections.
Typical processing time: Varies by project complexity; initial review typically 2-4 weeks.
Required inspections
Scheduling and sequence
- 541-575-1519 (phone)
- Scheduling deadline
- Inspections must be scheduled by appointment.
- Inspection hours
- Monday-Friday, 8:00 AM-12:00 PM and 1:00 PM-5:00 PM
- Time windows
- Inspections conducted every Tuesday by appointment.
Typical sequence: Multiple inspections typically required: foundation, framing, electrical, plumbing, final.
Frequently asked
Common questions about Dayville permits
01 Do I need a building permit in Dayville, OR? ▸
02 How do I apply for a building permit in Dayville, OR? ▸
03 How long does it take to get a building permit in Dayville, OR? ▸
04 What work is exempt from building permits in Dayville, OR? ▸
05 How do I schedule a building inspection in Dayville, OR? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Grant County Planning & Development Department before applying. Jaspector is not legal advice.