On this page 6
When a permit is required
Permit triggers and exempt work for Bixby
Building permit process page covers residential and commercial permit review. City directs applicants to use MyGov for all permitting and contractor licensing.
Note: No consolidated exempt-work list was located on the reviewed public permit pages. Verify minor work exemptions directly with Bixby Development Services before starting work.
- HVAC plan analysis
- Braced wall line drawings and calculations
- Complete site plan
- Full construction drawings
- Certificate of liability insurance
- Workers compensation insurance if applicable
- Water service form
- Erosion and sediment information where applicable
- Building code
- City Code and Oklahoma 2015 Energy Code Compliance Guide. The reviewed permit page does not publish a consolidated current edition list for all adopted building codes.
- Contractor requirements
- Bixby uses MyGov for all contractor licensing as well as permitting.
Application process
Application → plan check → issuance → inspection → final
- 01 Confirm project type through Development Services and gather the city requirements for the permit class.
- 02 Create a MyGov account. Bixby transitioned to MyGov for all permitting and contractor licensing effective January 9, 2024.
- 03 Upload the residential or commercial permit package. For residential permits, Bixby requires HVAC plan analysis, braced wall line drawings and calculations, site plan with easements and setbacks, full construction drawings, certificate of liability insurance, workers compensation insurance if applicable, and water service form.
- 04 Pay fees through the city's approved fee schedule.
- 05 Request inspections through the city's inspection request page/process.
- 06 Final inspection closes the permit.
Fee schedule
Effective Fiscal Year 2026
MyGov account and city fee schedule govern payment handling
Fees change periodically. Confirm at the official fee schedule ↗ (effective Fiscal Year 2026) before budgeting.
Required inspections
Scheduling and sequence
- Request an Inspection page (online)
- Inspection hours
- Main switchboard 8 a.m. to 5 p.m.
- Time windows
- Specific inspection windows not published on reviewed pages
Typical sequence: Project-specific; city directs applicants to request inspections after permit issuance.
Frequently asked
Common questions about Bixby permits
01 Do I need a building permit in Bixby, OK? ▸
02 How much does a building permit cost in Bixby, OK? ▸
03 How do I apply for a building permit in Bixby, OK? ▸
04 How do I schedule a building inspection in Bixby, OK? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Bixby Development Services before applying. Jaspector is not legal advice.