When a permit is required
Permit triggers and exempt work for Medina
Permits are required to build, alter, repair, demolish, or change occupancy of structures, and for regulated electrical, plumbing, HVAC, roof, deck, pool, fire suppression, and accessory structure work.
- Permit application
- Plans and specifications
- Site plan or zoning information as applicable
- Additional residential or commercial submittals per city requirement sheets
- Contractor registration materials where applicable
- Building code
- As of March 1, 2024: 2024 Ohio Building Code, 2024 Ohio Mechanical Code, 2024 Ohio Plumbing Code, 2023 NEC, 2021 IFGC, 2017 Ohio Fire Code, and related accessibility and energy provisions.
- Contractor requirements
- Contractors and subcontractors working in the city must be registered. The registration form requires liability insurance and current state licenses for applicable OCILB categories.
Application process
Typical processing: Same-day and over-the-counter permitting available for some work. Minimum 2 weeks for plan review on some permit types such as fire suppression. Processing time varies by permit type.
- 01 Determine the permit type from the city's Applications, Permits, Notices page and download the matching form (Building Permit, Electrical Permit, HVAC Permit, Plumbing Permit, Deck Permit, or Accessory Structure Permit).
- 02 Prepare the application and supporting plans. The city posts separate residential and commercial submittal requirement documents and requires contractors working in the city to be registered.
- 03 Submit the application and plans to the Building Department at 132 North Elmwood Avenue. Multiple paper plan sets may be required depending on permit type.
- 04 Pay plan review and permit fees under the city fee schedule.
- 05 After approval, receive the permit, post it on site, and schedule required inspections with the Building Department.
- 06 Obtain final approval and, where applicable, a certificate of occupancy.
Typical processing time: Same-day and over-the-counter permitting available for some work. Minimum 2 weeks for plan review on some permit types such as fire suppression. Processing time varies by permit type.
Fee schedule
Effective 2025-03
Effective October 1, 2024, credit card transactions in person and online and online EFT payments carry processing fees.
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2025-03) before budgeting.
Required inspections
Scheduling and sequence
- 330-722-9030 (phone)
- Scheduling deadline
- 24 hour notice required; inspectors have up to 72 hours to perform inspection after request.
- Inspection hours
- Monday-Friday, 8:00 AM to 5:00 PM
Typical sequence: Typical sequence: footer, top of block, foundation, rough framing, insulation, and final inspections, with specialized inspections for other work types.
Frequently asked
Common questions about Medina permits
01 Do I need a building permit in Medina, OH? ▸
02 How much does a building permit cost in Medina, OH? ▸
03 How do I apply for a building permit in Medina, OH? ▸
04 How long does it take to get a building permit in Medina, OH? ▸
05 How do I schedule a building inspection in Medina, OH? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Medina Building Department before applying. Jaspector is not legal advice.