When a permit is required
Permit triggers and exempt work for Waverly
Building permits are required for any new structure, pools, covered patios and carports, decks more than 16 inches above grade, additions, major repairs, use-changing alterations, major renovation affecting structural walls/plumbing/wiring, repairs to condemned or violating houses, larger or new windows/doors, foundations, chimneys and fireplaces, multiple dwellings, demolition, replacement of components when changing size or location, all fences, floodplain construction including fill, signs, and all roof replacement including shingles. Permits are required for Uniform Code or Energy Code work, subject to listed exemptions.
- Exempt Siding repair/replacement
- Exempt Driveways except where a curb cut is needed
- Exempt Uncovered patios and decks below 16 inches
- Exempt Installation of cabinets/paneling/plaster/plasterboard/trim on existing walls
Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Building / Code Enforcement office before proceeding.
- Building code
- New York State Uniform Fire Prevention and Building Code and Energy Code
- Permit validity
- Permits become invalid if work does not start within 6 months and expire 12 months after issuance unless renewed.
- Owner-builder
- Contact the code office for owner-builder requirements.
- Contractor requirements
- Contractors must comply with New York State licensing requirements.
Application process
Typical processing: Contact the code office for current processing times.
- 01 Contact the Village of Waverly Building / Code Enforcement office.
- 02 Review the Building Permit Guidelines to confirm permit requirements.
- 03 Obtain and complete the permit application.
- 04 Prepare required submittal documents.
- 05 Submit application and documents to the code office.
- 06 Pay applicable permit fees.
- 07 Schedule and complete required inspections.
- 08 Obtain final approval or certificate of occupancy before occupancy.
Typical processing time: Contact the code office for current processing times.
Required inspections
Scheduling and sequence
- 607-426-7240 (phone)
- Scheduling deadline
- Contact the code office to arrange inspection appointments.
- Inspection hours
- Contact the code office for hours.
Typical sequence: Contact the code office for required inspection stages and scheduling.
Frequently asked
Common questions about Waverly permits
01 Do I need a building permit in Waverly, NY? ▸
02 How do I apply for a building permit in Waverly, NY? ▸
03 How long does it take to get a building permit in Waverly, NY? ▸
04 What work is exempt from building permits in Waverly, NY? ▸
05 How do I schedule a building inspection in Waverly, NY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Waverly Building / Code Enforcement before applying. Jaspector is not legal advice.