When a permit is required
Permit triggers and exempt work for Franklin
A building permit is required for construction and structural alterations in the Village of Franklin.
Note: Consult the Building/Code Officer for current exemptions and clarification on permit requirements.
- Completed building permit application
- Site plan showing property location and proposed work
- Construction plans or drawings
- Proof of ownership or authorization
- Building permit fee
- Building code
- New York State Uniform Fire Prevention and Building Code
- Permit validity
- Consult the Building/Code Officer for specific permit validity periods.
- Owner-builder
- Owner-builders may apply but must comply with all code requirements.
- Contractor requirements
- Contractors must hold appropriate New York State licenses and carry workers' compensation insurance.
Application process
Typical processing: 1-3 weeks for initial review
- 01 Contact the Village Clerk or Building/Code Officer at 607-829-6776.
- 02 The village does not surface a stand-alone permit packet on indexed pages, but it does maintain a separate village building/code function.
- 03 Confirm the current application form, fee schedule, and filing method directly with the village clerk or building/code officer before filing.
- 04 Complete the building permit application with all required information.
- 05 Prepare site plan and construction drawings as appropriate.
- 06 Submit the application, drawings, and fee to the Building/Code Officer.
- 07 The Code Officer reviews for compliance with the New York State Uniform Building Code.
- 08 Obtain any required zoning or planning-board approvals before permit issuance.
- 09 The permit is issued after approval and fee payment.
Typical processing time: 1-3 weeks for initial review
Fee schedule
Effective As published by the Village
Required inspections
Scheduling and sequence
- 607-829-6776 (phone)
- Scheduling deadline
- Contact the Building/Code Officer for scheduling information
- Inspection hours
- Contact the Building/Code Officer for office hours
- Time windows
- Inspection windows determined by the Building/Code Officer
Typical sequence: Sequence depends on project type; consult with the Building/Code Officer.
Contact the Building/Code Officer regarding remote inspection availability.
Frequently asked
Common questions about Franklin permits
01 Do I need a building permit in Franklin, NY? ▸
02 How much does a building permit cost in Franklin, NY? ▸
03 How do I apply for a building permit in Franklin, NY? ▸
04 How long does it take to get a building permit in Franklin, NY? ▸
05 How do I schedule a building inspection in Franklin, NY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Franklin Building / Code Officer before applying. Jaspector is not legal advice.