jaspector
City building permits

Village of Cuba

How to apply for a building permit in Village of Cuba, New Mexico. Permit authority, application steps, fees, and inspection requirements.

Avg processing
Not published.
Last verified
April 2026
On this page 6
§ 01

Permit authority

Village of Cuba Administrative Office

Street address
16B E. Cordova Ave., Cuba, NM 87013
Coverage
Cuba is a small rural village. Based on available information, the village does not have its own building permit department. Building permits for the Cuba area (within village limits) are likely processed through NM CID, with any local zoning or land-use clearance handled by the village administrative office.
Online portal
NM RLD Construction Industries Division
NM RLD/CID Portal
§ 02

When a permit is required

Permit triggers and exempt work for Cuba

NM state law and CID rules apply. Permit required for new construction, additions, structural alterations, re-roofs, demolitions, and manufactured home placements.

Detached accessory structures 120 sq ft or under
Fences not exceeding 6 feet
Platforms, walks, and driveways not more than 30 inches above grade
Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
  • Exempt Detached accessory structures 120 sq ft or under
  • Exempt Fences not exceeding 6 feet
  • Exempt Platforms, walks, and driveways not more than 30 inches above grade
  • Exempt Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
Required documents
  • Per CID requirements. Contact village for any local requirements.
Building code
NM state codes as enforced by CID. Village may have adopted local zoning ordinances; contact village for details.
Permit validity
Per NM CID rules (180-day commencement, 13-month maximum).
Owner-builder
Per NM CID statewide homeowner permit rules.
Contractor requirements
Valid NM state CID contractor license required.
§ 03

Application process

Typical processing: Not published.

  1. 01
    Contact Village of Cuba at 575-289-3758 to confirm local process and whether any local zoning clearance is required.
  2. 02
    If the village requires a local zoning or land-use determination, complete that step first.
  3. 03
    Obtain floodplain determination (from village or county if applicable).
  4. 04
    Submit building permit application to NM CID with all required plans and documents.
  5. 05
    CID processes and issues permit; CID handles inspections.

Typical processing time: Not published.

Source: Village of Cuba Administrative Office ↗

§ 04

Fee schedule

Cuba building permit fees

Fee type
Amount
01
Plan check fee
20% of building permit fee (CID rule).
02
Permit fee formula
$3.00 per $1,000 up to $15,000; $1.00 per $1,000 over $15,000.
03
Reinspection fee
$80 first reinspection, $120 subsequent (CID rule).

Fees paid to CID. Contact Village for any local fees.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
Inspection hours
CID field office hours, Monday-Friday

Typical sequence: Foundation, slab/under-floor, framing, final (per CID).

§ 06

Frequently asked

Common questions about Cuba permits

01 Do I need a building permit in Cuba, NM?
NM state law and CID rules apply. Permit required for new construction, additions, structural alterations, re-roofs, demolitions, and manufactured home placements.
02 How much does a building permit cost in Cuba, NM?
Building permit fees in Cuba, NM are set by the local building department and vary by project type and valuation. Fees are calculated as: $3.00 per $1,000 up to $15,000; $1.00 per $1,000 over $15,000.. Plan check fee: 20% of building permit fee (CID rule)..
03 How do I apply for a building permit in Cuba, NM?
To apply for a building permit in Cuba, NM, follow these steps: 1. Contact Village of Cuba at 575-289-3758 to confirm local process and whether any local zoning clearance is required. 2. If the village requires a local zoning or land-use determination, complete that step first. 3. Obtain floodplain determination (from village or county if applicable). 4. Submit building permit application to NM CID with all required plans and documents. 5. CID processes and issues permit; CID handles inspections.
04 How long does it take to get a building permit in Cuba, NM?
Building permit processing times in Cuba, NM typically run Not published.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Cuba, NM?
Not all construction work requires a permit in Cuba, NM. The following work is generally exempt: Detached accessory structures 120 sq ft or under; Fences not exceeding 6 feet; Platforms, walks, and driveways not more than 30 inches above grade; Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Cuba, NM?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Cuba, NM via: 505-222-9813 or 877-CID-0979, NM CID Online Inspection Request.
last verified April 2026 source Village of Cuba Administrative Office ↗ entry id permits/new-mexico/sandoval/cuba

Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Cuba Administrative Office before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Sandoval County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Sandoval County jurisdictions →