How to apply for a building permit in Town of Unity, New Hampshire. Permit authority, application steps, fees, and inspection requirements.

New Hampshire Sullivan County Updated March 2026

Permit Authority

Town of Unity in western Sullivan County (population approximately 1,600). Unity has its own Land Use Ordinance (last updated 2017) and building code requirements including a minimum dwelling size of 750 square feet. Building Inspector Paul Moeller administers permits.

Department
Building Inspector
Address
Town Office, Unity, NH 03743
Phone
(603) 398-4017

Online Permit Portal

Platform: Town website • Account required: No • Submission: In-person only

Application Process

  1. Download Building Permit Application from the town website.
  2. Prepare required documents: sketch or plan of the proposed building with its intended use and construction details must accompany all applications for a permit to construct any building.
  3. A separate Driveway Permit is required for new building lots.
  4. Submit completed application with fee to Town Office.
  5. Application reviewed; after criteria are met and fee is paid, building permit is issued.
  6. Pick up permit within 30 days of issuance (permit becomes void if not picked up within 30 days).
  7. Post permit on job site; commence construction within six months of approval date (permit becomes void if operations not commenced within six months, unless building official grants extension).
  8. Schedule required inspections.
  9. A building or structure shall not be used or occupied, in whole or in part, until a Certificate of Occupancy has been issued.

Source: Building Inspector

General Requirements

New construction; additions; alterations; construction of any building or structure. Per Land Use Ordinance: any dwelling unit must be a minimum of 750 square feet. Driveway Permit required separately for new building lots. No structure may be used or occupied until Certificate of Occupancy is issued.

Required Documents

  • Completed building permit application
  • Sketch or plan of proposed building with intended use
  • Driveway Permit for new lots
Permit validity
Permit becomes void if not picked up within 30 days of issuance; building permit becomes void unless operations are commenced within six months of approval (unless building official grants extension).
Building code
Unity Land Use Ordinance (2017); NH State Building Code (RSA 155-A) as underlying framework.
Contractor requirements
NH-licensed electricians and plumbers required; no state GC license in NH.

Fees

Permit fee formula
Square footage-based -- Total square footage of proposed construction multiplied by $0.10 per square foot.
Payment note
Fee paid when permit is issued; contact Building Inspector Paul Moeller at (603) 398-4017 or Town Office at (603) 543-3102.

Work That Does NOT Require a Permit

Contact the Building Inspector to confirm whether your project requires a permit before starting work.

Inspections

How to Schedule

  • (603) 398-4017 or (603) 543-3102 (phone)
Inspection hours
Contact office for current hours.

Typical inspection sequence: Foundation, framing, rough-in, final inspection; Certificate of Occupancy required before use or occupancy.

Additional Resources

Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Building Inspector before applying.

Frequently Asked Questions

Town of Unity Building Permit FAQ

Do I need a building permit in Town of Unity, NH?
New construction; additions; alterations; construction of any building or structure. Per Land Use Ordinance: any dwelling unit must be a minimum of 750 square feet. Driveway Permit required separately for new building lots. No structure may be used or occupied until Certificate of Occupancy is issued.
How much does a building permit cost in Town of Unity, NH?
Fees are calculated as: Square footage-based -- Total square footage of proposed construction multiplied by $0.10 per square foot..
How do I apply for a building permit in Town of Unity, NH?
1. Download Building Permit Application from the town website. 2. Prepare required documents: sketch or plan of the proposed building with its intended use and construction details must accompany all applications for a permit to construct any building. 3. A separate Driveway Permit is required for new building lots. 4. Submit completed application with fee to Town Office. 5. Application reviewed; after criteria are met and fee is paid, building permit is issued. 6. Pick up permit within 30 days of issuance (permit becomes void if not picked up within 30 days). 7. Post permit on job site; commence construction within six months of approval date (permit becomes void if operations not commenced within six months, unless building official grants extension). 8. Schedule required inspections. 9. A building or structure shall not be used or occupied, in whole or in part, until a Certificate of Occupancy has been issued.
How do I schedule a building inspection in Town of Unity, NH?
Inspections can be scheduled via: (603) 398-4017 or (603) 543-3102.

Need help with your project?

Navigating permits in Town of Unity can be complicated.

Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.

Learn how Jaspector works
Important: This page is an educational resource provided by jaspector.com. It is not legal advice, and it does not substitute for official guidance from the permit authority listed above. Permit requirements, fees, and processes change frequently. Always verify current requirements directly with the issuing department before beginning any construction project. Use of this page does not create an attorney-client relationship. Jaspector assumes no liability for any outcomes arising from reliance on this information.