On this page 6
When a permit is required
Permit triggers and exempt work for Keene
All new construction, additions, alterations, demolitions, and changes in occupancy. Structural, electrical, plumbing, mechanical, accessibility, energy efficiency, and floodplain development all require permits.
Note: Specific exempt work list not published on city website; contact Building Safety Division for determination. General NH baseline exemptions (ordinary repairs, painting, landscaping) likely apply.
- Permit application
- Site plan
- Construction drawings
- Energy code application (for applicable projects)
- Subcontractor affidavit
- Homeowner affidavit (owner-builder projects)
- Specialty checklists (solar PV, EV charging, etc.)
- Building code
- State adopted codes (IBC 2021, IRC 2021, IPC 2021, IMC 2021, IECC 2018, NEC 2020) as implemented by the NH Building Code
- Permit validity
- Not specified on public pages; contact department
- Owner-builder
- Homeowner Affidavit form available; specific owner-builder rules not detailed publicly
- Contractor requirements
- Subcontractor Affidavit required; NH does not license general contractors at the state level, but electricians and plumbers must be state-licensed
Application process
Typical processing: Not publicly stated; contact department
- 01 Determine permit type needed (building, electrical, plumbing, mechanical, floodplain, etc.)
- 02 Download or access the appropriate application form from the Applications & Forms page
- 03 Prepare required documents: site plan, construction drawings, energy code application as applicable
- 04 Submit application online or in person at the Community Development office
- 05 Plan review conducted by Building Safety Division staff (ICC-certified inspectors)
- 06 Permit issued upon approval; posted on-site during construction
- 07 Schedule required inspections at each phase
- 08 Final inspection and Certificate of Occupancy issued upon completion
Typical processing time: Not publicly stated; contact department
Source: Building Safety Division, Community Development Department ↗
Fee schedule
Keene building permit fees
Contact Community Development at (603) 352-5440
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (603) 352-5440 (phone)
- CommunityDevelopment@KeeneNH.gov (email)
- Inspection hours
- Not publicly specified; contact department
Typical sequence: Foundation, framing, rough-in (plumbing/electrical/mechanical), insulation, final inspection, Certificate of Occupancy
Source: Building Safety Division, Community Development Department ↗
Frequently asked
Common questions about Keene permits
01 Do I need a building permit in Keene, NH? ▸
02 How much does a building permit cost in Keene, NH? ▸
03 How do I apply for a building permit in Keene, NH? ▸
04 How long does it take to get a building permit in Keene, NH? ▸
05 How do I schedule a building inspection in Keene, NH? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Safety Division, Community Development Department before applying. Jaspector is not legal advice.