When a permit is required
Permit triggers and exempt work for Conway
Any erection, construction, alteration, renovation, or change of use; new structures (houses, additions, sheds, pools, garages, decks); mechanical, electrical, and plumbing work associated with construction; demolition
Note: Not published as a standalone list; ordinary like-for-like repairs and maintenance are generally excluded; contact department to confirm whether specific work requires a permit
- Completed application (signed by owner)
- Site plan showing lot with all structures and setback dimensions
- Floor plans and elevations
- Wall section drawings for new exterior construction
- Contractor Registration Form if applicable
- Energy code compliance form for new homes and additions
- Building code
- 2021 International Building Code (IBC), 2021 International Residential Code (IRC), and 2021 NFPA 101 Life Safety Code; NH State Building Code (RSA 155-A) with NH amendments
- Permit validity
- 1 year from date of issuance
- Contractor requirements
- State-licensed electricians, plumbers, and gas fitters required; contractor registration with the Town of Conway required for contractors
Application process
Typical processing: Varies by project complexity and seasonal workload; contact department
- 01 Create a CloudPermit account at https://us.cloudpermit.com/gov/login
- 02 Select permit type (residential, commercial, electrical, plumbing, mechanical, septic, driveway, sign, demolition, excavation)
- 03 Complete application and upload required documents (site plan, floor plans, construction drawings)
- 04 Submit application online; alternatively, deliver paper application and plans to 23 Main Street
- 05 Pay applicable fees at time of submission
- 06 Department staff review for completeness and code compliance; revisions may be requested
- 07 Permit issued upon approval (electronic via CloudPermit or paper)
- 08 Post permit on-site and keep approved plans available for inspectors
- 09 Schedule required inspections through CloudPermit or by calling (603) 447-3811 ext. 223
- 10 Complete final inspection to close permit
Typical processing time: Varies by project complexity and seasonal workload; contact department
Required inspections
Scheduling and sequence
- CloudPermit portal (online)
- (603) 447-3811 ext. 223 (phone)
- Inspection hours
- Monday-Friday, 8:30 AM - 4:30 PM
Typical sequence: Footing/foundation, rough framing, rough MEP (mechanical, electrical, plumbing), insulation, final; varies by project type
Frequently asked
Common questions about Conway permits
01 Do I need a building permit in Conway, NH? ▸
02 How do I apply for a building permit in Conway, NH? ▸
03 How long does it take to get a building permit in Conway, NH? ▸
04 How do I schedule a building inspection in Conway, NH? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Inspection & Code Enforcement before applying. Jaspector is not legal advice.