When a permit is required
Permit triggers and exempt work for Papillion
New single-family residences; commercial/multifamily construction; residential additions and remodels; basement finishes; accessory structures (fences, sheds, decks, detached garages, re-roofing, pools, driveways/patios); electrical; mechanical; plumbing; fire sprinkler and alarm systems; signs; street/curb cuts; storage tanks; change of occupancy
- Exempt Sheds completely in the backyard that are less than 200 square feet in area, less than 10 feet tall, and detached
- Exempt Minor repairs and maintenance as defined in IRC Section R105.2 and IBC Section 105.2
Note: Specific exemptions under 'Permits shall not be required for the following' as stated in Ordinance 1740; contact department or review ordinance for full list
- Completed online application
- Site/plot plan
- Construction drawings
- Energy code certification (Nebraska Energy Code Certification form)
- Specific checklists per permit type (deck brochure, detached garage/shed submittal, egress window handout, etc.)
- For commercial: Minimum Standards for Site and Building Plans and Civil Site Plan Guidance
- Emergency business contact form
- Building code
- 2018 International Residential Code (IRC); 2018 International Building Code (IBC); 2018 International Plumbing Code (IPC); 2018 International Mechanical Code (IMC); 2018 International Fuel Gas Code (IFGC); 2018 International Existing Building Code (IEBC); 2018 International Energy Conservation Code (IECC); 2018 International Fire Code (IFC); 2018 International Code Council Performance Code (ICCPC); 2018 International Property Maintenance Code (IPMC, effective 5/17/2023); 2023 National Electrical Code (NEC, effective 8/1/2024); NFPA 1 and NFPA 101 Life Safety Code (2012 editions, per state delegation effective 3/3/2021)
- Permit validity
- Not separately published; contact department
- Owner-builder
- Homeowners may pull electrical permits but must sign a Homeowner Verification Form in person at the city office; State of Nebraska electrician license is required for contractor electrical permits
- Contractor requirements
- Electrical contractors: State of Nebraska license required; other trades: confirm with department at 402-597-2029
Application process
Typical processing: Not published; contact department at 402-597-2029
- 01 Create an account at https://aca.accela.com/papillion/default.aspx.
- 02 Determine permit type (residential, commercial, accessory use, electrical, mechanical, plumbing, fire, signs, etc.).
- 03 Download and review applicable submittal documents from https://www.papillion.org/186/Permit-Application-Forms before beginning online application.
- 04 Submit the permit application online; upload all required plans and documents.
- 05 Pay permit fees online; some permit types are automatically issued upon submission; others require plan review.
- 06 For electrical permits: state of Nebraska electrician license is required; homeowner verification form must be signed at the city office for owner-pull electrical permits.
- 07 If plan review is required, applicant is notified via Accela portal when approved or if corrections are needed.
- 08 Permit is issued; permit card must be posted on the job site.
- 09 Schedule inspections through the Accela portal or by calling the inspections hotline at 402-597-2072.
- 10 Receive final inspection and certificate of occupancy upon completion.
Typical processing time: Not published; contact department at 402-597-2029
Fee schedule
Papillion building permit fees
Online payment through Accela portal; in-person payment at City Hall
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- Accela portal (online)
- 402-597-2072 (inspections hotline) (phone)
- Scheduling deadline
- Leave project type, address, and contact information when calling hotline
- Inspection hours
- Monday through Friday, standard business hours
Typical sequence: Foundation (after trenches excavated); frame inspection (after roof and framing in place and before insulation/covering); final inspection (after construction complete and ready for occupancy); trade-specific inspections for electrical, plumbing, mechanical as required
Frequently asked
Common questions about Papillion permits
01 Do I need a building permit in Papillion, NE? ▸
02 How much does a building permit cost in Papillion, NE? ▸
03 How do I apply for a building permit in Papillion, NE? ▸
04 How long does it take to get a building permit in Papillion, NE? ▸
05 What work is exempt from building permits in Papillion, NE? ▸
06 How do I schedule a building inspection in Papillion, NE? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Fire Safety Department before applying. Jaspector is not legal advice.