When a permit is required
Permit triggers and exempt work for Bellevue
New construction; additions; alterations; remodels; electrical work; plumbing; mechanical; demolition; signs; swimming pools; decks; fences; re-roofing; structural changes; any work regulated by adopted codes
- Exempt Emergency repairs posing immediate risk to life and safety
- Exempt Replacement of nonstructural siding on IRC structures (except stucco and brick/stone veneer more than 4 feet above grade)
- Exempt In-kind window replacement with no structural member alteration
- Exempt Flag and light poles on private property 20 feet or less in height (electrical work for poles is still subject to permit)
Note: Other exemptions as listed in adopted building code Section R105.2/105.2; confirm complete list with department
- Permit application
- Site/plot plan
- Construction drawings
- Contractor license information
- Energy code certification for new construction
- Building code
- 2018 International Building Code (IBC); 2018 International Residential Code (IRC); 2018 International Existing Building Code; 2023 National Electrical Code (NEC) (enforcement began January 1, 2025); other I-Codes at 2018 edition. Note: Some sources indicate the city may have updated to 2021 IBC/IRC; confirm with department.
- Permit validity
- Not separately published on department page; contact department for current validity period
- Owner-builder
- Not separately published; electrical work requires a licensed electrician or homeowner verification form
- Contractor requirements
- Contractors must be licensed for their trade; electrical work requires a State of Nebraska electrician license; permit fees are based on fair market value of work
Application process
Typical processing: Not published; contact department
- 01 Confirm the property is within Bellevue's jurisdiction (contact department at 402-293-3014 if unsure).
- 02 Prepare required documents: site plan, construction drawings, contractor information.
- 03 Create an account at the CityReporter portal.
- 04 Submit the permit application online and upload supporting documents.
- 05 Planning Department reviews application for zoning and design standard compliance; both residential and commercial applications are reviewed.
- 06 Building review conducted concurrently or sequentially.
- 07 Pay permit fees online upon approval.
- 08 Permit is issued; post permit card on site.
- 09 Schedule required inspections through the portal or by calling 402-293-3014.
- 10 Receive final inspection and occupancy clearance.
Typical processing time: Not published; contact department
Source: Permits and Inspections Office ↗
Fee schedule
Bellevue building permit fees
Online payment through CityReporter portal; in-person payment at 1510 Wall Street
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- CityReporter portal (online)
- 402-293-3014 (phone)
- Inspection hours
- Monday through Friday, 8:00 AM to 4:30 PM
Typical sequence: Foundation; rough-in framing; rough-in plumbing/electrical/mechanical; insulation; final; occupancy
Frequently asked
Common questions about Bellevue permits
01 Do I need a building permit in Bellevue, NE? ▸
02 How much does a building permit cost in Bellevue, NE? ▸
03 How do I apply for a building permit in Bellevue, NE? ▸
04 How long does it take to get a building permit in Bellevue, NE? ▸
05 What work is exempt from building permits in Bellevue, NE? ▸
06 How do I schedule a building inspection in Bellevue, NE? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Permits and Inspections Office before applying. Jaspector is not legal advice.