On this page 6
When a permit is required
Permit triggers and exempt work for Gulfport
Required for new construction, additions, alterations, repairs, demolition, and most trade work (electrical, plumbing, HVAC, mechanical). Check with Building Code Services to confirm if a specific scope requires a permit.
Note: Not published in detail on the city website. Contact Building Code Services at 228-868-5700 or 311@gulfport-ms.gov to confirm whether specific work requires a permit.
- Completed application (varies by permit type)
- Plans in PDF format
- Site plan
- Project valuation
- For residential development: see minimum submittal requirements at https://cms3.revize.com/revize/gulfportms/Documents/Departments/Urban%20Development/cogscanner_20250319_095245.pdf
- For commercial development: see minimum submittal requirements at https://cms3.revize.com/revize/gulfportms/Documents/Departments/Urban%20Development/Building%20Code%20Services/Minimum%20Submittal%20Requirement%20Commercial%20Development.pdf
- Building code
- Mississippi Building Code 2018, based on IBC 2018. The city is a participating community in the National Flood Insurance Program (NFIP).
- Permit validity
- Not explicitly published; contact 228-868-5700.
- Owner-builder
- Not published online; contact Building Code Services.
- Contractor requirements
- Contractor license application available from Building Code Services. Only licensed contractors may pull trade permits.
Source: City of Gulfport, Urban Development — Building Code Services ↗
Application process
Typical processing: Not published; contact 228-868-5700 for current timeline.
- 01 Create an account on BS&A Online at https://bsaonline.com/?uid=3078.
- 02 Select the applicable permit type from the 15 available application types (General Permit, Electrical, HVAC, Plumbing, etc.).
- 03 Complete the permit application form.
- 04 Upload all required plans and attachments in PDF format only via the portal or the SharePoint upload link. Inaccurate or incomplete submissions delay processing.
- 05 Applications may alternatively be submitted in person or by mail to 1410 24th Avenue, Gulfport, MS 39501.
- 06 Building Code Services reviews the application (plan review).
- 07 Permit is issued; construction begins.
- 08 Schedule required inspections through the BS&A portal.
- 09 Final inspection and certificate of occupancy issued upon completion.
Typical processing time: Not published; contact 228-868-5700 for current timeline.
Source: City of Gulfport, Urban Development — Building Code Services ↗
Fee schedule
Gulfport building permit fees
Not published online; contact Building Code Services at 228-868-5700 for current payment methods and fee details.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- BS&A Online Portal (online)
- Inspection hours
- Monday-Friday, 8:00 AM to 5:00 PM
Typical sequence: Typical sequence: (1) Foundation/footing; (2) framing/rough-in for structural, electrical, plumbing, and mechanical; (3) final inspection and certificate of occupancy. For flood zone properties: elevation certificate required at specified phases.
Source: City of Gulfport, Urban Development — Building Code Services ↗
Frequently asked
Common questions about Gulfport permits
01 Do I need a building permit in Gulfport, MS? ▸
02 How much does a building permit cost in Gulfport, MS? ▸
03 How do I apply for a building permit in Gulfport, MS? ▸
04 How long does it take to get a building permit in Gulfport, MS? ▸
05 How do I schedule a building inspection in Gulfport, MS? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Gulfport, Urban Development — Building Code Services before applying. Jaspector is not legal advice.