On this page 6
When a permit is required
Permit triggers and exempt work for Dedham
A building permit is required for all construction within the Town of Dedham.
- Exempt One-story detached accessory structures with floor area 120 square feet or less
- Exempt Fences not exceeding 7 feet in height
- Exempt Retaining walls not more than 4 feet in height (measured from bottom of footing), unless retaining surcharge or impounding liquid
- Exempt Water tanks supported directly on grade, not exceeding 5,000 gallons, with a height-to-diameter ratio of 2:1 or less
- Exempt Sidewalks and driveways not more than 30 inches above adjacent grade and not over any basement or story below
- Exempt Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
- Exempt Residential accessory above-ground swimming pools less than 24 inches deep, less than 5,000 gallons, and not permanently connected to any structure
- Exempt Window awnings supported by an exterior wall projecting no more than 54 inches from the wall
Note: Statewide 780 CMR 105.2 exemptions apply. Contact Building Commissioner Kenneth Cimeno at (781) 751-9182 with questions about specific project exemptions.
- Completed OpenGov application
- Plot plan showing lot dimensions, setbacks, existing structures, and zoning compliance
- Construction drawings
- CSL/HIC license documentation (or homeowner exemption)
- Workers' compensation affidavit
- Building code
- 780 CMR (Massachusetts State Building Code)
- Permit validity
- Permit lapses if work does not commence within six months of issuance or if work is abandoned for six months.
- Owner-builder
- Homeowner exemption available for primary one- or two-family residence. CSL required for contractor-pulled permits.
- Contractor requirements
- CSL required for contractor-pulled permits; HIC registration required for home improvement contractors. Double permit fee penalty if work started without permit.
Source: Building Department ↗
Application process
Typical processing: Varies by project complexity; contact Building Department for estimate.
- 01 Access OpenGov portal at dedhamma.portal.opengov.com/categories/1071.
- 02 Select permit type (building, electrical, plumbing, gas, zoning, etc.).
- 03 Complete online application: property address, project description, estimated construction value, contractor and license information.
- 04 Upload required attachments: plot plan, construction drawings, CSL/HIC license documentation, workers' compensation affidavit.
- 05 Pay fees online through portal.
- 06 Building Department reviews application for zoning compliance and code requirements.
- 07 Permit issued electronically; print and post on site before commencing work.
- 08 Schedule inspections by contacting Building Department during office hours; inspectors also available alternating Wednesday evenings.
Typical processing time: Varies by project complexity; contact Building Department for estimate.
Source: Building Department ↗
Fee schedule
Effective February 1, 2023 (fee increase effective date)
Payment processed through OpenGov portal online
Fees change periodically. Confirm at the official fee schedule ↗ (effective February 1, 2023 (fee increase effective date)) before budgeting.
Required inspections
Scheduling and sequence
- (781) 751-9180 (phone)
- Scheduling deadline
- Schedule during office hours
- Inspection hours
- Monday--Thursday until 4:00 PM; Wednesday until 7:00 PM (year-round); Friday until 1:00 PM. Inspectors available alternating Wednesday evenings (confirm specific hours).
- Time windows
- General office hours; inspectors available alternating Wednesday evenings
Typical sequence: Typical sequence: foundation/footing, framing, rough electrical, rough plumbing, rough gas (each trade inspector separately), insulation, final building, final electrical, final plumbing, final gas.
Not specified; contact Building Department for remote inspection eligibility
Source: Building Department ↗
Frequently asked
Common questions about Dedham permits
01 Do I need a building permit in Dedham, MA? ▸
02 How much does a building permit cost in Dedham, MA? ▸
03 How do I apply for a building permit in Dedham, MA? ▸
04 How long does it take to get a building permit in Dedham, MA? ▸
05 What work is exempt from building permits in Dedham, MA? ▸
06 How do I schedule a building inspection in Dedham, MA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department before applying. Jaspector is not legal advice.