On this page 6
When a permit is required
Permit triggers and exempt work for Odenton
County permit triggers apply based on scope, including structural work, additions, accessory structures, pools, waterproofing, signs, commercial alterations, and similar work.
- Exempt Residential patios, subject to grading caveat
- Exempt Detached small decks outside Critical Area and bog constraints
- Exempt Small gazebos outside the Critical Area
- Exempt Shingle-only roof replacement
- Exempt Solar removal
- Exempt In-kind solar removal and reinstallation without a building permit, with electrical permit still required
- Exempt Small sheds outside the Critical Area
Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Department of Inspections and Permits before proceeding.
- County record-type PDF submittals
- Plans and site plans
- Supporting planning documents (may be more important for Odenton Town Center development projects)
- Building code
- Anne Arundel County adopted code package, effective June 23, 2024.
- Permit validity
- County permit expires if work does not commence within 1 year of issuance.
- Owner-builder
- Homeowners may apply for ordinary repairs or construction on owner-occupied dwellings; Landowner Affidavit route exists for some new-home owner-builders.
- Contractor requirements
- County-licensed tradesmen required for electrical, mechanical, and plumbing trade permits; state licenses still interact with intake.
Source: Anne Arundel County Department of Inspections and Permits ↗
Application process
Typical processing: No one-size-fits-all county estimate is posted. LUN displays an approximate due date during review. Separate development-review timing inside the Odenton Town Center depends on project type and is not summarized in a single public permitting table.
- 01 Confirm permit and approval needs through the county permit lookup and identify whether the parcel is in the Odenton Town Center planning area.
- 02 Review zoning, planned-use, utility, environmental, and right-of-way conditions.
- 03 Create a Land Use Navigator (LUN) account and file the correct county permit application.
- 04 Upload required PDFs, certify the filing, and submit through the fee cart.
- 05 Monitor review comments and approximate due dates in LUN; revise if reviewers request changes.
- 06 Coordinate any additional county planning or development review tied to the Odenton Town Center if the project falls within that area.
- 07 After issuance, request inspections and complete all finals.
Typical processing time: No one-size-fits-all county estimate is posted. LUN displays an approximate due date during review. Separate development-review timing inside the Odenton Town Center depends on project type and is not summarized in a single public permitting table.
Source: Anne Arundel County Department of Inspections and Permits ↗
Fee schedule
Effective 2026
Cost is calculated through the county LUN application; some larger Odenton Town Center projects may also encounter separate planning-review or impact-fee issues depending on scope
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2026) before budgeting.
Required inspections
Scheduling and sequence
- Land Use Navigator (LUN) portal (online)
- County dispatcher support (phone)
- Inspection hours
- 7:30 a.m. to 4:00 p.m. Monday through Friday
- Time windows
- LUN available dates shown in blue; dispatcher hours 7:30 a.m. to 4:00 p.m. Monday through Friday
Typical sequence: County sequence by scope, with permit active for 24 hours before first inspection and all trade finals completed before final building inspection
Source: Anne Arundel County Department of Inspections and Permits ↗
Frequently asked
Common questions about Odenton permits
01 Do I need a building permit in Odenton, MD? ▸
02 How much does a building permit cost in Odenton, MD? ▸
03 How do I apply for a building permit in Odenton, MD? ▸
04 How long does it take to get a building permit in Odenton, MD? ▸
05 What work is exempt from building permits in Odenton, MD? ▸
06 How do I schedule a building inspection in Odenton, MD? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Anne Arundel County Department of Inspections and Permits before applying. Jaspector is not legal advice.