On this page 6
When a permit is required
Permit triggers and exempt work for Richmond
New construction, additions, alterations, re-roofing, window replacement, demolition, driveway entrance construction (town and state), interior plumbing, septic tank replacement, road openings, sign installation.
- Exempt Ordinary maintenance and repair not involving structural change
- Exempt Painting, decorating, finish work
Note: Specific exemptions depend on which building code version is currently enforced. Confirm with CEO.
- Completed permit application
- Site plan
- Construction drawings
- Building Permit Application Instructions (reference)
- Building code
- Richmond website references 2015 IBC/IRC as of research date. Note: MUBEC is optional for municipalities under 4,000. If adopted effective April 7, 2025, 2021 codes apply. Confirm current adoption status with CEO.
- Permit validity
- Not publicly specified; confirm with CEO.
- Owner-builder
- Not detailed publicly; contact CEO.
- Contractor requirements
- Maine-licensed electricians; Maine-licensed plumbers.
Source: Code Enforcement ↗
Application process
Typical processing: Contact office for estimate.
- 01 Contact Code Enforcement Officer at (207) 737-4305 x205 or ceo@richmondmaine.com to determine permit type and requirements.
- 02 Download Building Permit Application Instructions and applicable application form from town website.
- 03 Submit completed application with required documentation.
- 04 Code Enforcement Officer reviews and may request additional information.
- 05 Fee paid upon approval per town fee schedule.
- 06 Permit issued; post at job site.
- 07 Schedule required inspections with CEO.
Typical processing time: Contact office for estimate.
Source: Code Enforcement ↗
Fee schedule
Richmond building permit fees
Contact CEO at (207) 737-4305 x205 for complete current fee schedule.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- (207) 737-4305 x205 (phone)
- ceo@richmondmaine.com (email)
- Inspection hours
- Monday through Thursday 7:00 AM to 5:00 PM
Typical sequence: Typical sequence: Foundation, framing, rough-in plumbing, final inspection.
Source: Code Enforcement ↗
Frequently asked
Common questions about Richmond permits
01 Do I need a building permit in Richmond, ME? ▸
02 How much does a building permit cost in Richmond, ME? ▸
03 How do I apply for a building permit in Richmond, ME? ▸
04 How long does it take to get a building permit in Richmond, ME? ▸
05 What work is exempt from building permits in Richmond, ME? ▸
06 How do I schedule a building inspection in Richmond, ME? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Code Enforcement before applying. Jaspector is not legal advice.