On this page 5
When a permit is required
Permit triggers and exempt work for Phippsburg
Any project with a value over $1,000.00 (interior or exterior) typically requires a permit. Call first to confirm. Shoreland zone work requires permit regardless of cost. Flood Hazard Area Development Permit required for work in FEMA flood zones.
- Exempt Ordinary maintenance and repair below $1,000 in value (approximate threshold -- call CEO to confirm)
- Exempt Painting, decorating, finish work with no structural change
Note: Always call CEO to confirm before starting any project. Shoreland zone work may not be exempt.
- Completed application
- Site plan
- Construction drawings
- Building code
- MUBEC optional for Phippsburg (population under 4,000). Current adoption status should be confirmed with CEO.
- Permit validity
- Not publicly specified; confirm with CEO.
- Owner-builder
- Not detailed publicly; confirm with CEO.
- Contractor requirements
- Maine-licensed electricians; Maine-licensed plumbers.
Application process
Typical processing: Contact office; limited afternoon hours require advance planning.
- 01 Call Code Enforcement Officer Lee Rainey at (207) 389-2653 BEFORE starting any project to confirm if a permit is required (any project with a value over $1,000.00 inside or outside typically requires a permit).
- 02 Download the Building Permit Fillable form from https://phippsburg.com/forms
- 03 Complete application with required documents and submit in person or by mail to CEO.
- 04 Code Enforcement Officer reviews for compliance with town ordinances and applicable codes.
- 05 Pay applicable fees.
- 06 Permit issued; post at job site.
- 07 Schedule required inspections with CEO.
- 08 For shoreland zone work: Contact CEO BEFORE cutting any trees or vegetation within the Shoreland Zone or Resource Protection areas.
Typical processing time: Contact office; limited afternoon hours require advance planning.
Required inspections
Scheduling and sequence
- (207) 389-2653 (phone)
- codes@phippsburg.com (email)
- Inspection hours
- Monday through Friday, 2:00 PM to 5:00 PM. LIMITED AFTERNOON HOURS - plan inspections well in advance.
Typical sequence: Typical sequence: Foundation, framing, rough-in plumbing, final inspection. Shoreland zone: CEO must inspect and approve work in shoreland zone.
Frequently asked
Common questions about Phippsburg permits
01 Do I need a building permit in Phippsburg, ME? ▸
02 How do I apply for a building permit in Phippsburg, ME? ▸
03 How long does it take to get a building permit in Phippsburg, ME? ▸
04 What work is exempt from building permits in Phippsburg, ME? ▸
05 How do I schedule a building inspection in Phippsburg, ME? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Code Enforcement (Codes Enforcement) before applying. Jaspector is not legal advice.