Permit Authority
Town of Boothbay (distinct from Boothbay Harbor). Population well below 4,000; MUBEC adoption is discretionary. Notably, the Town of Boothbay does NOT have a formal building code. The town follows NFPA 101 Life Safety Code (which incorporates some construction-related provisions but is not a comprehensive building code). Zoning and land use ordinance still apply. Significant shoreland zoning.
- Department
- Code Enforcement / Zoning Office
- Address
- 7 Corey Lane, PO Box 106, Boothbay, ME 04537
- Phone
- (207) 633-2051
Online Permit Portal
Platform: PDF applications • Account required: No • Submission: In-person only
Application Process
- Contact the Code Enforcement / Zoning Office at (207) 633-2051 or dfeeney@townofboothbay.org to discuss project and determine requirements under the Zoning Ordinance.
- Obtain applicable permit application (zoning, shoreland zoning, sign, etc.) from the office or website.
- If Planning Board review is required, applications must be submitted at least 14 days prior to a scheduled Planning Board meeting.
- Complete and submit application with required supporting documents.
- Pay applicable fee per the Code Enforcement / Zoning Fee Schedule.
- Permit issued (for uses permitted by right) or Planning Board approval obtained (for conditional uses).
- Post permit at job site.
- Schedule inspections as required under NFPA 101 or other applicable state standards.
Source: Code Enforcement / Zoning Office
General Requirements
Zoning and land use permits required for construction, use changes, and development activities under the Zoning Ordinance. Shoreland Zoning permits required for work in the shoreland zone (enforced locally). Note: No formal building code applies; however NFPA 101 Life Safety Code applies where relevant. State plumbing code and electrical licensing requirements apply.
Required Documents
- Zoning permit application
- Site plan
- Building plans as required by Zoning Ordinance
- Building code
- No formal building code. NFPA 101 Life Safety Code applies (limited scope). MUBEC not adopted as of available public information.
- Contractor requirements
- State-licensed electrician for electrical work. State-licensed plumber for plumbing. No Maine general contractor license. No municipal building code inspection for structural work.
Fees
- Payment note
- Contact office for payment methods.
Fees change. Verify current amounts at the official fee schedule.
Work That Does NOT Require a Permit
- Normal maintenance that does not involve construction or land disturbance
Important: Refer to Zoning Ordinance for full exemptions. Confirm with Code Enforcement Office given absence of formal building code.
Inspections
How to Schedule
- (207) 633-2051 (phone)
- dfeeney@townofboothbay.org (email)
- Inspection hours
- Contact office for current hours.
Typical inspection sequence: Limited building inspection; focus on zoning and life safety compliance.
Additional Resources
- Building code: No formal building code. NFPA 101 Life Safety Code applies (limited scope). MUBEC not adopted as of available public information.
- Zoning information: View zoning info
- Zones and Maps
- Ordinances
- FAQ (No Building Code)
- License lookup guide: Maine Contractor License Requirements
- Contract template: Maine Homeowner-Contractor Agreement
- Maine hub: Maine Contractor License & Permit Hub
Information on this page was last verified: March 2026. Permit rules and fees change — confirm current requirements directly with the Code Enforcement / Zoning Office before applying.
Frequently Asked Questions
Town of Boothbay Building Permit FAQ
- Do I need a building permit in Town of Boothbay, ME?
- Zoning and land use permits required for construction, use changes, and development activities under the Zoning Ordinance. Shoreland Zoning permits required for work in the shoreland zone (enforced locally). Note: No formal building code applies; however NFPA 101 Life Safety Code applies where relevant. State plumbing code and electrical licensing requirements apply.
- How do I apply for a building permit in Town of Boothbay, ME?
- 1. Contact the Code Enforcement / Zoning Office at (207) 633-2051 or dfeeney@townofboothbay.org to discuss project and determine requirements under the Zoning Ordinance. 2. Obtain applicable permit application (zoning, shoreland zoning, sign, etc.) from the office or website. 3. If Planning Board review is required, applications must be submitted at least 14 days prior to a scheduled Planning Board meeting. 4. Complete and submit application with required supporting documents. 5. Pay applicable fee per the Code Enforcement / Zoning Fee Schedule. 6. Permit issued (for uses permitted by right) or Planning Board approval obtained (for conditional uses). 7. Post permit at job site. 8. Schedule inspections as required under NFPA 101 or other applicable state standards.
- What work is exempt from building permits in Town of Boothbay, ME?
- The following work is generally exempt: Normal maintenance that does not involve construction or land disturbance. Note: Refer to Zoning Ordinance for full exemptions. Confirm with Code Enforcement Office given absence of formal building code.
- How do I schedule a building inspection in Town of Boothbay, ME?
- Inspections can be scheduled via: (207) 633-2051, dfeeney@townofboothbay.org.
Need help with your project?
Navigating permits in Town of Boothbay can be complicated.
Jaspector connects you with local experts who can review your scope, verify your contractor, and help you understand what permits your project actually needs.
Learn how Jaspector worksOther cities in Lincoln County
View all Lincoln County jurisdictions →