On this page 6
When a permit is required
Permit triggers and exempt work for Maize
Same as MABCD jurisdiction. For questions specific to Maize, contact City Hall at 316-722-7561.
- Exempt Same as MABCD exemptions for Wichita jurisdiction
Note: See MABCD section for complete exemptions.
- Same as MABCD requirements
- Building code
- Wichita-Sedgwick County Unified Building and Trade Code (2024 IBC, 2024 IEBC, 2018 IRC, 2023 NEC, and associated codes).
- Permit validity
- Consistent with MABCD rules (180 days).
- Owner-builder
- Consistent with MABCD rules.
- Contractor requirements
- MABCD contractor license required.
Application process
Typical processing: Consistent with MABCD standard processing.
- 01 Contact the City of Maize to confirm whether a permit is required and to verify the address is within Maize city limits.
- 02 Apply for permits through the MABCD Portal at https://mabcdportal.sedgwickcounty.org/ or in person at MABCD (271 W. 3rd St. N., Wichita, KS 67202).
- 03 Submit all required documents and project information.
- 04 Pay permit fees via MABCD Portal or in person.
- 05 Permit is issued.
- 06 Schedule inspections through the MABCD Portal or IVR (316-660-9550).
Typical processing time: Consistent with MABCD standard processing.
Source: City of Maize / Metropolitan Area Building and Construction Department (MABCD) ↗
Fee schedule
Maize building permit fees
Via MABCD Portal or in person at MABCD.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- MABCD Portal (online)
- IVR phone system (phone)
- Inspection hours
- MABCD office hours (Mon-Tue-Thu-Fri 8 a.m.-5 p.m., Wed 9 a.m.-5 p.m.).
Typical sequence: Same as MABCD standard sequence.
Frequently asked
Common questions about Maize permits
01 Do I need a building permit in Maize, KS? ▸
02 How much does a building permit cost in Maize, KS? ▸
03 How do I apply for a building permit in Maize, KS? ▸
04 How long does it take to get a building permit in Maize, KS? ▸
05 What work is exempt from building permits in Maize, KS? ▸
06 How do I schedule a building inspection in Maize, KS? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Maize / Metropolitan Area Building and Construction Department (MABCD) before applying. Jaspector is not legal advice.