On this page 6
When a permit is required
Permit triggers and exempt work for Haysville
Required for construction, remodels, additions, fences, mechanical work (HVAC, water heater), plumbing, electrical, and other construction activity. Permits must be obtained before work begins.
Note: Not separately listed on city website. Consult Chapter 17 of the Haysville Municipal Code or contact 316-529-5940 for the full exemptions list.
- Completed permit application
- Site plan showing property location
- Construction drawings as applicable
- Building code
- 2018 International Residential Code (IRC) for one- and two-family dwellings; 2018 International Building Code (IBC) for commercial; 2020 NFPA 70 (National Electrical Code) for electrical work.
- Permit validity
- Not publicly specified. Contact department for current rules.
- Owner-builder
- Not publicly specified.
- Contractor requirements
- All contractors and tradesmen must hold both a current, valid MABCD contractor license AND a City of Haysville contractor license prior to being issued a permit.
Application process
Typical processing: Not publicly specified.
- 01 Download or obtain the appropriate permit application from the Permits and Plans page.
- 02 Prepare required documents: completed application, site plan (does not need to be to scale), and applicable construction drawings.
- 03 Submit application and documents to Public Works at 401 S. Jane, by fax to 316-529-5945, or by emailing a scan to permits@haysvilleks.gov.
- 04 Pay permit fee in person at the Public Works office or over the phone by calling 316-529-5940.
- 05 Permit is issued. Emergency work may begin before permit issuance only if contractor obtains permit the next business day.
- 06 Call 316-529-5940 (1-2 business days in advance) to schedule required inspections.
Typical processing time: Not publicly specified.
Source: City of Haysville Public Works / Inspections Department ↗
Fee schedule
Haysville building permit fees
Payment in person at Public Works (401 S. Jane) or by phone.
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- 316-529-5940 (phone)
- Scheduling deadline
- One to two business days in advance
- Inspection hours
- Monday-Thursday 7:30 a.m. to 5:00 p.m., Friday 7:30 a.m. to 11:30 a.m. Inspections on a first-come, first-served basis; if calling same day, inspection will be after 1:00 p.m. subject to inspector availability.
Typical sequence: Depends on project type. Contact the Inspections Department for required sequence.
Frequently asked
Common questions about Haysville permits
01 Do I need a building permit in Haysville, KS? ▸
02 How much does a building permit cost in Haysville, KS? ▸
03 How do I apply for a building permit in Haysville, KS? ▸
04 How long does it take to get a building permit in Haysville, KS? ▸
05 How do I schedule a building inspection in Haysville, KS? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Haysville Public Works / Inspections Department before applying. Jaspector is not legal advice.