How to apply for a building permit in City of Goddard, Kansas. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
Not publicly specified.
Last verified
April 2026
On this page 6
§ 01

Permit authority

City of Goddard Community Development/Planning Department

Street address
118 N. Main, P.O. Box 667, Goddard, KS 67052
Coverage
Goddard processes all permits for work within city limits. Contractors must be licensed with MABCD. The Sedgwick County Department of Code Enforcement/MABCD acts as the Building Official for Goddard under an interlocal agreement.
Online portal
City of Goddard Permits
CivicEngage
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Goddard

Required for new construction, additions, renovations, and trade work within city limits. Contractors must hold a current MABCD license.

Note: Not separately published. Contact Community Development at 316-794-2441 for exemption details.

Required documents
  • Completed application
  • Site plan
  • Construction drawings and specifications as required by scope of work
Building code
Uniform Building Code (UBC) plus ICC codes: International Residential Code (IRC), International Fire Code (IFC), International Plumbing Code (IPC), International Mechanical Code (IMC), and International Energy Conservation Code (IECC).
Permit validity
Permits are valid for 180 calendar days. May be extended at the discretion of the Planning Commission. Permits terminate when no construction progress occurs for more than 180 calendar days.
Owner-builder
Not publicly specified.
Contractor requirements
All contractors must hold a current MABCD contractor license.
§ 03

Application process

Typical processing: Plan review target is 10 business days. Turnaround may vary for complex projects.

  1. 01
    Contact the Community Development/Planning Department at 316-794-2441 or visit City Hall to obtain permit application forms.
  2. 02
    Request a pre-application conference if applicable (available at applicant's request or if staff determines one is needed).
  3. 03
    Submit completed application with required drawings and documentation.
  4. 04
    Staff reviews plans. Every effort is made to complete plan review within 10 business days of submission.
  5. 05
    Applicant is notified via fax, email, or telephone when plans and permits are ready for pickup, and is advised of applicable fees at that time.
  6. 06
    Pay all fees to the City. Permit is issued upon payment.
  7. 07
    Schedule inspections as required for each phase of construction.

Typical processing time: Plan review target is 10 business days. Turnaround may vary for complex projects.

Source: City of Goddard Community Development/Planning Department ↗

§ 04

Fee schedule

Goddard building permit fees

Fee type
Amount
01
Minimum permit fee
Not publicly specified.
02
Plan check fee
Included in the fee calculation communicated to applicant at plan pickup.
03
Permit fee formula
Fees calculated using adopted Residential Building Permit Fee Formulas (based on project valuation/scope). Reinspection fee: $250.00.
04
Reinspection fee
$250.00 per reinspection.

Payment made to the City of Goddard at City Hall when picking up permit.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Community Development/Planning Department (phone)
Inspection hours
City Hall hours (typically Monday-Friday business hours). Contact city for specifics.

Typical sequence: Foundation, framing, rough-in trades, insulation, final. Contact the department for the required sequence for your project type.

§ 06

Frequently asked

Common questions about Goddard permits

01 Do I need a building permit in Goddard, KS?
Required for new construction, additions, renovations, and trade work within city limits. Contractors must hold a current MABCD license.
02 How much does a building permit cost in Goddard, KS?
Building permit fees in Goddard, KS are set by the local building department and vary by project type and valuation. The minimum permit fee is Not publicly specified.. Fees are calculated as: Fees calculated using adopted Residential Building Permit Fee Formulas (based on project valuation/scope). Reinspection fee: $250.00.. Plan check fee: Included in the fee calculation communicated to applicant at plan pickup..
03 How do I apply for a building permit in Goddard, KS?
To apply for a building permit in Goddard, KS, follow these steps: 1. Contact the Community Development/Planning Department at 316-794-2441 or visit City Hall to obtain permit application forms. 2. Request a pre-application conference if applicable (available at applicant's request or if staff determines one is needed). 3. Submit completed application with required drawings and documentation. 4. Staff reviews plans. Every effort is made to complete plan review within 10 business days of submission. 5. Applicant is notified via fax, email, or telephone when plans and permits are ready for pickup, and is advised of applicable fees at that time. 6. Pay all fees to the City. Permit is issued upon payment. 7. Schedule inspections as required for each phase of construction.
04 How long does it take to get a building permit in Goddard, KS?
Building permit processing times in Goddard, KS typically run Plan review target is 10 business days. Turnaround may vary for complex projects.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Goddard, KS?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Goddard, KS via: Community Development/Planning Department.
last verified April 2026 source City of Goddard Community Development/Planning Department ↗ entry id permits/kansas/sedgwick/goddard