How to apply for a building permit in Town of Bargersville, Indiana. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Planning and Zoning, Town of Bargersville

Street address
24 N Main Street, Bargersville, IN 46106
Coverage
Bargersville runs its own permit and zoning process through Town Planning and Zoning and a Tyler EnerGov citizen portal.
Online portal
Tyler EnerGov Citizen Self Service
Tyler EnerGov
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Bargersville

The residential packet covers new work, additions, remodels, demolition, detached garages, accessory structures, pools, storage structures, electrical upgrades, and mobile homes. No building or structure may be used, constructed, altered, or maintained except in conformity with the ordinance.

Required documents
  • Completed application
  • Site information
  • Utility information
  • Contractor information
  • Construction plans
  • Project-specific supporting forms
  • Septic approval when applicable
Building code
Bargersville's UDO incorporates applicable Indiana Code and Indiana Administrative Code references.
Permit validity
Permits are void if construction has not begun within 90 days of issue date. Construction must be completed within 18 months of issue date.
Contractor requirements
Permit packets require licensed trade information. Local permit administration routes applicants through staff.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Use the Bargersville permit page to choose the correct application or begin in EnerGov Citizen Self Service.
  2. 02
    Complete the application and assemble the required site plan, construction plans, contractor details, and utility information.
  3. 03
    Submit through the portal or with the town's posted forms.
  4. 04
    Wait for zoning and building review and for staff notification that the permit is ready.
  5. 05
    Pay building, utility, stormwater, and other applicable fees when assigned.
  6. 06
    Post the permit and complete required inspections before occupying the structure.
  7. 07
    Do not occupy the structure until all inspections are complete and all fees are paid so that a Certificate of Occupancy can be issued.

Source: Planning and Zoning, Town of Bargersville ↗

§ 04

Fee schedule

Bargersville building permit fees

Fee type
Amount
01
Permit fee formula
Fees are assigned by permit type through town review; no machine-readable building fee table was posted.

Water meter deposits of $100 and irrigation deposits of $100 where applicable. Other permit charges filled in by staff on the packet.

§ 05

Required inspections

Scheduling and sequence

How to schedule

Typical sequence: Zoning and building review, permit issuance, then required field inspections before Certificate of Occupancy.

§ 06

Frequently asked

Common questions about Bargersville permits

01 Do I need a building permit in Bargersville, IN?
The residential packet covers new work, additions, remodels, demolition, detached garages, accessory structures, pools, storage structures, electrical upgrades, and mobile homes. No building or structure may be used, constructed, altered, or maintained except in conformity with the ordinance.
02 How much does a building permit cost in Bargersville, IN?
Building permit fees in Bargersville, IN are set by the local building department and vary by project type and valuation. Fees are calculated as: Fees are assigned by permit type through town review; no machine-readable building fee table was posted..
03 How do I apply for a building permit in Bargersville, IN?
To apply for a building permit in Bargersville, IN, follow these steps: 1. Use the Bargersville permit page to choose the correct application or begin in EnerGov Citizen Self Service. 2. Complete the application and assemble the required site plan, construction plans, contractor details, and utility information. 3. Submit through the portal or with the town's posted forms. 4. Wait for zoning and building review and for staff notification that the permit is ready. 5. Pay building, utility, stormwater, and other applicable fees when assigned. 6. Post the permit and complete required inspections before occupying the structure. 7. Do not occupy the structure until all inspections are complete and all fees are paid so that a Certificate of Occupancy can be issued.
04 How do I schedule a building inspection in Bargersville, IN?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Bargersville, IN via: EnerGov process.
last verified April 2026 source Planning and Zoning, Town of Bargersville ↗ entry id permits/indiana/johnson/bargersville

Educational reference. Permit rules and fees change — confirm current requirements directly with Planning and Zoning, Town of Bargersville before applying. Jaspector is not legal advice.