jaspector
City building permits

Village of Chatham

How to apply for a building permit in Village of Chatham, Illinois. Permit authority, application steps, fees, and inspection requirements.

Code adoption
2021 IRC/IBC (Updated per 2025 mandate)
Avg processing
5-7 business days.
Min. permit fee
$50
Last verified
April 2026
On this page 6
§ 01

Permit authority

Village of Chatham Building Department

Street address
116 E. Mulberry St., Chatham, IL 62629
Coverage
Within Chatham village limits.
Online portal
Chatham Forms
Custom
§ 02

When a permit is required

Permit triggers and exempt work for Chatham

New structures, additions, remodels, fences, pools, and decks.

Retaining walls under 4 feet
Fences (require a no-fee or low-fee zoning permit, but verify first)
Painting/flooring
  • Exempt Retaining walls under 4 feet
  • Exempt Fences (require a no-fee or low-fee zoning permit, but verify first)
  • Exempt Painting/flooring

Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Building Department before proceeding.

Required documents
  • Plat of survey or scaled site plan
  • Construction plans
  • Contractor registration
Building code
2021 IRC/IBC (Updated per 2025 mandate)
Owner-builder
Homeowners may perform work but must demonstrate code knowledge.
Contractor requirements
Must be registered with the Village.

Source: Village of Chatham Building Department ↗

§ 03

Application process

Typical processing: 5-7 business days.

  1. 01
    Submit Building Permit application with 2 sets of plans.
  2. 02
    Provide a plat of survey or scaled site plan showing setbacks.
  3. 03
    Review period for zoning and code compliance.
  4. 04
    Issuance of permit and placard.

Typical processing time: 5-7 business days.

Source: Village of Chatham Building Department ↗

§ 04

Fee schedule

Effective 2025

Fee type
Amount
01
Minimum permit fee
$50
02
Permit fee formula
Square footage based for new residential ($0.20 per sq ft); flat fees for small projects

Fees change periodically. Confirm at the official fee schedule ↗ (effective 2025) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (217) 697-5509 (at least 48 hours in advance; 4 hours for footings) (phone)
Scheduling deadline
Call at least 48 hours in advance (4 hours for footings).
Inspection hours
Standard business hours
§ 06

Frequently asked

Common questions about Chatham permits

01 Do I need a building permit in Chatham, IL?
New structures, additions, remodels, fences, pools, and decks.
02 How much does a building permit cost in Chatham, IL?
Building permit fees in Chatham, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $50. Fees are calculated as: Square footage based for new residential ($0.20 per sq ft); flat fees for small projects.
03 How do I apply for a building permit in Chatham, IL?
To apply for a building permit in Chatham, IL, follow these steps: 1. Submit Building Permit application with 2 sets of plans. 2. Provide a plat of survey or scaled site plan showing setbacks. 3. Review period for zoning and code compliance. 4. Issuance of permit and placard.
04 How long does it take to get a building permit in Chatham, IL?
Building permit processing times in Chatham, IL typically run 5-7 business days.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Chatham, IL?
Not all construction work requires a permit in Chatham, IL. The following work is generally exempt: Retaining walls under 4 feet; Fences (require a no-fee or low-fee zoning permit, but verify first); Painting/flooring. Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Building Department before proceeding. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Chatham, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Chatham, IL via: (217) 697-5509 (at least 48 hours in advance; 4 hours for footings). Call at least 48 hours in advance (4 hours for footings)..
last verified April 2026 source Village of Chatham Building Department ↗ entry id permits/illinois/sangamon/chatham

Educational reference. Permit rules and fees change — confirm current requirements directly with Village of Chatham Building Department before applying. Jaspector is not legal advice.