When a permit is required
Permit triggers and exempt work for Sangamon County
New construction, additions, structural alterations (roofing, siding, windows), accessory structures (sheds, pools, decks), and mechanical/plumbing/electrical systems.
- Exempt Minor cosmetic repairs (painting, carpeting)
- Exempt Fences under 6 feet in height (check zoning setbacks)
- Exempt Retaining walls under 4 feet
- Exempt Moveable cases, counters, and partitions
Note: Exempt from building permit does not mean exempt from zoning and planning requirements. Confirm edge cases with the Building and Zoning Department before proceeding.
- Site plan or positional diagram
- Construction drawings (scaled)
- Contractor registration/license
- Utility disconnection letters (for demolition)
- Building code
- 2021 IBC, 2021 IRC, 2021 IEBC, 2023 NEC (State Mandated)
- Permit validity
- Generally valid for 1 year; work must commence within 6 months.
- Owner-builder
- Owners may perform work on their primary residence but must sign an affidavit and comply with state plumbing/electrical codes.
- Contractor requirements
- Plumbers must be state-licensed (IDFPR). Roofers must be state-licensed. General contractors must be registered with the county.
Application process
Typical processing: 5-10 business days for standard residential; longer for commercial.
- 01 Determine if the project is within a municipal boundary or unincorporated area.
- 02 Download and complete the applicable Building Permit Application (Residential, Commercial, or Ag-Exempt).
- 03 Submit application along with a site plan/positional diagram and construction drawings to the Building Safety Section.
- 04 Zoning check followed by Building Safety review.
- 05 Permit issuance upon fee payment.
Typical processing time: 5-10 business days for standard residential; longer for commercial.
Fee schedule
Effective 2025
Checks payable to Sangamon County Zoning
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2025) before budgeting.
Required inspections
Scheduling and sequence
- (217) 753-6760 (at least 24 hours in advance) (phone)
- Scheduling deadline
- Call at least 24 hours in advance.
- Inspection hours
- Monday - Friday, 8:30 AM - 3:30 PM
Typical sequence: Typical sequence: Footing, Foundation, Under-slab, Rough-in (Plumbing/Electric/HVAC), Framing, Insulation, Final.
Frequently asked
Common questions about unincorporated Sangamon County permits
01 Do I need a building permit in unincorporated Sangamon County, IL? ▸
02 How much does a building permit cost in unincorporated Sangamon County, IL? ▸
03 How do I apply for a building permit in unincorporated Sangamon County, IL? ▸
04 How long does it take to get a building permit in unincorporated Sangamon County, IL? ▸
05 What work is exempt from building permits in unincorporated Sangamon County, IL? ▸
06 How do I schedule a building inspection in unincorporated Sangamon County, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Sangamon County Department of Building and Zoning before applying. Jaspector is not legal advice.