On this page 6
When a permit is required
Permit triggers and exempt work for Bourbonnais
Most construction activities require a permit. Contact building department before beginning any construction, alterations, or repair work to confirm.
Note: Not explicitly enumerated on village website. Work done outside code scope (e.g., cosmetic interior work not affecting structure or systems) is generally not required to have a permit, but confirm with department.
- Completed permit application
- Plat of survey showing existing and proposed structures (for exterior work)
- Drawings or blueprints
- Contractor name, address, and phone
- HOA information where applicable
- Building code
- International Building Code (2018); International Residential Code (2018); International Mechanical Code (2018); International Fire Protection Code (2018); International Property Maintenance Code (2018); International Fuel Gas Code (2018); National Electrical Code (2017); Illinois State Plumbing Code (current); Illinois Accessibility Code (current); Illinois Energy Conservation Code (current).
- Contractor requirements
- Electricians and plumbers must hold IDFPR state licenses. No other specific requirements stated.
Application process
Application → plan check → issuance → inspection → final
- 01 Determine whether project requires a permit by calling (815) 937-3575 or emailing building@villageofbourbonnais.com.
- 02 Download the appropriate permit application from the village website permits page.
- 03 For exterior projects (decks, additions, pools), obtain a plat of survey showing existing and proposed structures.
- 04 Gather required documentation including drawings/blueprints and contractor information.
- 05 Submit application in person at 255 Mooney Dr., 7:00 AM - 3:30 PM Monday-Friday.
- 06 Pay permit fee.
- 07 Schedule required inspections through the Building Department.
Fee schedule
Bourbonnais building permit fees
In-person at 255 Mooney Dr.
Required inspections
Scheduling and sequence
- (815) 937-3575 (phone)
- building@villageofbourbonnais.com (email)
- Scheduling deadline
- Schedule inspections ahead of time
- Inspection hours
- Monday-Friday, 7:00 AM to 3:30 PM
Typical sequence: Project-dependent. Inspections required for all work. Key personnel: Building Commissioner Paul Hafner; Electrical Inspector Bob Steinke; Plumbing Inspector Mike Magruder; HVAC Inspector Jim Patterson; Code Enforcement Officer Eric Cyr.
Frequently asked
Common questions about Bourbonnais permits
01 Do I need a building permit in Bourbonnais, IL? ▸
02 How do I apply for a building permit in Bourbonnais, IL? ▸
03 How do I schedule a building inspection in Bourbonnais, IL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Department and Code Enforcement before applying. Jaspector is not legal advice.