§ IL Boone County
City building permits

Village of Poplar Grove

How to apply for a building permit in Village of Poplar Grove, Illinois. Permit authority, application steps, fees, and inspection requirements.

Min. permit fee
$25
Last verified
April 2026
On this page 6
§ 01

Permit authority

Building and Code Department, Village of Poplar Grove

Street address
200 N. Hill Street, Poplar Grove, IL 61065
Coverage
Serves properties within the incorporated limits of the Village of Poplar Grove. The village does NOT handle permits for Candlewick Lake or Timberlane.
§ 02

When a permit is required

Permit triggers and exempt work for Poplar Grove

State-required Licensed Permits (via B&F): roofing, decks, porches, new construction, additions, sheds, plumbing, electrical, pools with electrical components, detached garages, solar panels. Village-issued Permits: fences, swimming pools (non-electrical), window replacements, hen/coop structures, tree planting/removal.

Note: A 'When a Permit is Not Required' document is available at https://www.poplargrove-il.gov/sites/default/files/fileattachments/building_and_code/page/7062/when_a_permit_is_not_required_-_final_8.29.23.pdf (dated August 29, 2023). Download directly from the village website for the authoritative list. Common IRC/IBC exemptions typically include cosmetic repairs, painting, like-material repairs, and small accessory structures below code thresholds, but confirm against the village's published document.

Required documents
  • Completed Building Permit Application
  • $25 application fee
  • Three sets of construction drawings (framing, electrical, mechanical, plumbing, energy)
  • Three copies of site plan/plat of survey
  • Three copies of grading plan
  • Right-of-Way Bond (new construction; confirm amount with Village Hall)
  • Contractor information with proof of insurance
Building code
Per Ordinance 2025-14: 2021 ICC International Building Code (IBC) and International Residential Code (IRC), 2020 National Electrical Code (NEC), 2014 Illinois Plumbing Code, 2024 Illinois Energy Conservation Code, 2021 Illinois Accessibility Code
Permit validity
Not explicitly stated on website for building permits generally; specific timelines are set per project.
Contractor requirements
Contractor must provide proof of insurance at application. No statewide general contractor license in Illinois. State-licensed trades (electricians, plumbers) must hold IDFPR license. B&F reviews contractor qualifications as part of plan review.

Source: Building and Code Department, Village of Poplar Grove ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Determine permit type needed (state-required licensed permit vs. village-issued permit).
  2. 02
    Download and complete the Building Permit Application (available at https://www.poplargrove-il.gov/sites/default/files/fileattachments/building_and_code/page/3171/2026_building_permit_application.pdf).
  3. 03
    Prepare three sets of construction drawings showing framing, electrical, mechanical, plumbing, and energy details.
  4. 04
    Prepare three copies of a site plan/plat of survey showing location, dimensions, and distances to lot lines.
  5. 05
    Prepare three copies of a grading plan showing the elevation of the proposed top of foundation and all grade lines.
  6. 06
    If new construction, confirm Right-of-Way Bond requirements with Village Hall.
  7. 07
    Submit application packet with $25 application fee in person or by mail to Village Hall, 200 N. Hill Street, Poplar Grove IL 61065.
  8. 08
    B&F Construction Code Services (inspector Vince Gallo) reviews the application and contacts the applicant with next steps and any additional fees.
  9. 09
    Schedule inspections by calling B&F at (847) 428-7010 or emailing inspectionrequests@bfccs.org.

Source: Building and Code Department, Village of Poplar Grove ↗

§ 04

Fee schedule

Effective 2024

Fee type
Amount
01
Minimum permit fee
$25
02
Plan check fee
Billed by B&F Construction Code Services; contact (847) 428-7010
03
Permit fee formula
$25 application fee paid to the village at submission. Additional plan review and inspection fees are billed by B&F Construction Code Services.

The $25 application fee is payable to the Village of Poplar Grove at submission (in person or by mail). B&F fees are paid separately per their process.

Fees change periodically. Confirm at the official fee schedule ↗ (effective 2024) before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (847) 428-7010 (phone)
  • inspectionrequests@bfccs.org (email)
Inspection hours
B&F is physically present at Poplar Grove Village Hall on Mondays and Wednesdays from 10 a.m. to 3 p.m. to answer questions.

Typical sequence: Conducted on a case-by-case basis. Standard sequence would include footing, framing/rough-in (electrical, plumbing, mechanical), insulation, and final. Confirm specific required inspections for your project with B&F.

Source: Building and Code Department, Village of Poplar Grove ↗

§ 06

Frequently asked

Common questions about Poplar Grove permits

01 Do I need a building permit in Poplar Grove, IL?
State-required Licensed Permits (via B&F): roofing, decks, porches, new construction, additions, sheds, plumbing, electrical, pools with electrical components, detached garages, solar panels. Village-issued Permits: fences, swimming pools (non-electrical), window replacements, hen/coop structures, tree planting/removal.
02 How much does a building permit cost in Poplar Grove, IL?
Building permit fees in Poplar Grove, IL are set by the local building department and vary by project type and valuation. The minimum permit fee is $25. Fees are calculated as: $25 application fee paid to the village at submission. Additional plan review and inspection fees are billed by B&F Construction Code Services.. Plan check fee: Billed by B&F Construction Code Services; contact (847) 428-7010.
03 How do I apply for a building permit in Poplar Grove, IL?
To apply for a building permit in Poplar Grove, IL, follow these steps: 1. Determine permit type needed (state-required licensed permit vs. village-issued permit). 2. Download and complete the Building Permit Application (available at https://www.poplargrove-il.gov/sites/default/files/fileattachments/building_and_code/page/3171/2026_building_permit_application.pdf). 3. Prepare three sets of construction drawings showing framing, electrical, mechanical, plumbing, and energy details. 4. Prepare three copies of a site plan/plat of survey showing location, dimensions, and distances to lot lines. 5. Prepare three copies of a grading plan showing the elevation of the proposed top of foundation and all grade lines. 6. If new construction, confirm Right-of-Way Bond requirements with Village Hall. 7. Submit application packet with $25 application fee in person or by mail to Village Hall, 200 N. Hill Street, Poplar Grove IL 61065. 8. B&F Construction Code Services (inspector Vince Gallo) reviews the application and contacts the applicant with next steps and any additional fees. 9. Schedule inspections by calling B&F at (847) 428-7010 or emailing inspectionrequests@bfccs.org.
04 How do I schedule a building inspection in Poplar Grove, IL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Poplar Grove, IL via: (847) 428-7010, inspectionrequests@bfccs.org.
last verified April 2026 source Building and Code Department, Village of Poplar Grove ↗ entry id permits/illinois/boone/poplar-grove

Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Code Department, Village of Poplar Grove before applying. Jaspector is not legal advice.