On this page 6
When a permit is required
Permit triggers and exempt work for Shalimar
Except in some minor instances, the town's permit requirements mirror Okaloosa County's requirements and most construction needs a permit.
- Exempt Only some minor instances are outside the permit requirement; town FAQ does not publish a full exemption chart.
Note: Confirm applicable exemptions directly with the town.
- Town building permit application
- Plans and specifications as applicable
- Okaloosa County permit documentation where FBC review required
- Town Contractor Tracking Certificate
- Building code
- Shalimar's ordinances define a building permit as a town-issued document and define a building official under the current Florida Building Code. Town permit form specifically reminds applicants that work must meet wind-load specifications.
- Permit validity
- Permits remain valid according to town and state law.
- Owner-builder
- Town-specific qualification follows Florida law.
- Contractor requirements
- Contractors working in town limits must contact Town Hall for a Contractor Tracking Certificate. Fee: $30 from October 1 through March 31; $15 from April 1 through September 30.
Source: Town of Shalimar ↗
Application process
Typical processing: Contact town for current processing times.
- 01 Submit to the Town of Shalimar first and obtain the required town permit for building, sign, tree removal, and related work.
- 02 Where the work requires Florida Building Code inspection, obtain the related Okaloosa County permit or permit review after town approval.
- 03 Ensure the contractor has a Town of Shalimar Contractor Tracking Certificate or town Business Tax Receipt as required.
- 04 For new construction, provide the town-signed foundation survey and complete town sign-off items before county CO issuance.
- 05 Complete final inspections through the applicable town/county process.
Typical processing time: Contact town for current processing times.
Source: Town of Shalimar ↗
Fee schedule
Effective 2026-03
No separate comprehensive building fee table was verified on the town website. Applicants should confirm total fees with the town and Okaloosa County.
Required inspections
Scheduling and sequence
- Town Hall (in-person)
- Scheduling deadline
- Contact town for current scheduling procedures.
Typical sequence: Certified foundation surveys must be approved by the town. The Growth Management Department calls the town on final inspections for new construction so the town can confirm its local requirements before CO issuance.
Source: Town of Shalimar ↗
Frequently asked
Common questions about Shalimar permits
01 Do I need a building permit in Shalimar, FL? ▸
02 How much does a building permit cost in Shalimar, FL? ▸
03 How do I apply for a building permit in Shalimar, FL? ▸
04 How long does it take to get a building permit in Shalimar, FL? ▸
05 What work is exempt from building permits in Shalimar, FL? ▸
06 How do I schedule a building inspection in Shalimar, FL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Shalimar before applying. Jaspector is not legal advice.