When a permit is required
Permit triggers and exempt work for Fort Walton Beach
The division issues permits and inspects structure, electrical, plumbing, mechanical, gas, fences, and signs, and enforces city code plus the Florida Building Code.
- Exempt Cosmetic work only such as carpet, tile, and painting does not require a permit.
Note: Confirm edge cases with the Building & Inspections Division before proceeding.
- Completed permit application
- Plans and site plans as applicable
- Engineered drawings for applicable projects
- Notice of Commencement if required
- Affidavits and supporting forms
- Building code
- Effective December 31, 2023, the 2023 Florida Building Code, 8th Edition, and 2020 National Electrical Code
- Permit validity
- Permits remain valid according to city and state law.
- Owner-builder
- Owner-builders must comply with Florida Statute 489.103, including the one-year personal-use rule for one- and two-family residences and the $75,000 cap for qualifying owner-builder commercial projects.
- Contractor requirements
- Contractors must hold valid state licensure and obtain city approval.
Source: City of Fort Walton Beach, Growth Management Department, Building & Inspections Division ↗
Application process
Typical processing: Plan review for projects with engineered drawings or site plans typically takes about 1-2 weeks depending on scope and reviewing departments.
- 01 Confirm the property is within Fort Walton Beach city limits.
- 02 Submit the application electronically through MGO.
- 03 Upload plans, engineered drawings, affidavits, Notice of Commencement if required, and other forms.
- 04 Respond to plan review comments; projects with engineered drawings or site plans undergo plan review.
- 05 Pay fees, obtain permit issuance, and then schedule inspections through MGO.
- 06 Complete final inspections and any Certificate of Occupancy requirements.
Typical processing time: Plan review for projects with engineered drawings or site plans typically takes about 1-2 weeks depending on scope and reviewing departments.
Source: City of Fort Walton Beach, Growth Management Department, Building & Inspections Division ↗
Fee schedule
Effective 2026-03
City publishes valuation-based construction permit fees and separate general and inspection fee tables. Certificate of Occupancy fee: $38.
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2026-03) before budgeting.
Required inspections
Scheduling and sequence
- MGO portal (online)
- Scheduling deadline
- Contact city for current scheduling procedures.
- Inspection hours
- Monday-Thursday 7:00 a.m.-4:30 p.m.; Friday 7:00 a.m.-11:00 a.m.
Typical sequence: City performs building inspections according to Florida Building Code requirements.
Source: City of Fort Walton Beach, Growth Management Department, Building & Inspections Division ↗
Frequently asked
Common questions about Fort Walton Beach permits
01 Do I need a building permit in Fort Walton Beach, FL? ▸
02 How much does a building permit cost in Fort Walton Beach, FL? ▸
03 How do I apply for a building permit in Fort Walton Beach, FL? ▸
04 How long does it take to get a building permit in Fort Walton Beach, FL? ▸
05 What work is exempt from building permits in Fort Walton Beach, FL? ▸
06 How do I schedule a building inspection in Fort Walton Beach, FL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Fort Walton Beach, Growth Management Department, Building & Inspections Division before applying. Jaspector is not legal advice.