On this page 6
When a permit is required
Permit triggers and exempt work for Fort Myers Beach
Building permits are required for all construction, alteration, repair, and demolition work in the Town of Fort Myers Beach.
- Completed notarized permit application
- Site plan
- Construction plans
- Notice of Commencement (recorded with Lee County Clerk for projects over $5,000)
- Contractor registration and licensing proof
- Owner-builder disclosure affidavit (if owner acting as contractor)
- Floodplain and coastal documentation (V-zone certificates, elevation certificates, substantial-improvement forms, floodplain acknowledgments)
- Building code
- Florida Building Code, 8th Edition (2023)
- Owner-builder
- If owner is acting as contractor, owner must sign owner-builder disclosure affidavit and must either perform the work personally or hire licensed contractors for applicable trades.
- Contractor requirements
- Contractors must register with Town, hold current licenses and insurance, and complete registration before work proceeds.
Application process
Typical processing: Variable; check iWorQ portal for current status.
- 01 Review Town of Fort Myers Beach permit requirements and identify applicable permit type.
- 02 Consult comprehensive applications-and-forms library covering commercial, residential, interior remodel, trade, demolition, pools, windows and doors, docks and shore, fences, site work, signs, driveway and right-of-way, private providers, and supplemental forms.
- 03 Prepare application materials and construction documents.
- 04 Have all applications notarized.
- 05 If project value exceeds $5,000, record Notice of Commencement with Lee County Clerk.
- 06 If owner is acting as contractor, sign owner-builder disclosure affidavit and ensure owner will perform work personally or hire licensed contractors.
- 07 Ensure contractor registration, licenses, and insurance are current before work proceeds.
- 08 Submit application through iWorQ portal.
- 09 Pay required fees.
- 10 Town staff reviews for compliance with building codes and zoning requirements.
- 11 If site-disturbing work applies, comply with stormwater pollution prevention planning and local impervious-surface retention standards.
- 12 If floodplain or coastal requirements apply, submit V-zone certificates, elevation certificates, substantial-improvement cost forms, and floodplain acknowledgments.
- 13 Respond to plan-review comments if required.
- 14 Request inspections through iWorQ portal using permit number and access code.
- 15 Pass all required inspections.
- 16 Once final inspections pass, town issues permits, inspections results, and printed job-site plans through iWorQ.
Typical processing time: Variable; check iWorQ portal for current status.
Fee schedule
Fort Myers Beach building permit fees
Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.
Required inspections
Scheduling and sequence
- iWorQ permit portal (online)
- inspections@fmbgov.com (email)
Typical sequence: Permit numbers are created in iWorQ once a complete application is received. Permit holder receives access code via email for inspection scheduling and results.
Frequently asked
Common questions about Fort Myers Beach permits
01 Do I need a building permit in Fort Myers Beach, FL? ▸
02 How much does a building permit cost in Fort Myers Beach, FL? ▸
03 How do I apply for a building permit in Fort Myers Beach, FL? ▸
04 How long does it take to get a building permit in Fort Myers Beach, FL? ▸
05 How do I schedule a building inspection in Fort Myers Beach, FL? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Fort Myers Beach Building Services before applying. Jaspector is not legal advice.