jaspector
§ FL Lee County
City building permits

Town of Fort Myers Beach

How to apply for a building permit in Town of Fort Myers Beach, Florida. Permit authority, application steps, fees, and inspection requirements.

Code adoption
Florida Building Code, 8th Edition (2023)
Last verified
April 2026
On this page 6
§ 01

Permit authority

Town of Fort Myers Beach Building Services

Street address
6231 Estero Blvd., Fort Myers Beach, FL 33931
Coverage
All properties within the incorporated Town of Fort Myers Beach.
Online portal
iWorQ Permit Portal
iWorQ
§ 02

When a permit is required

Permit triggers and exempt work for Fort Myers Beach

Building permits are required for all construction, alteration, repair, and demolition work in the Town of Fort Myers Beach.

Required documents
  • Completed notarized permit application
  • Site plan
  • Construction plans
  • Notice of Commencement (recorded with Lee County Clerk for projects over $5,000)
  • Contractor registration and licensing proof
  • Owner-builder disclosure affidavit (if owner acting as contractor)
  • Floodplain and coastal documentation (V-zone certificates, elevation certificates, substantial-improvement forms, floodplain acknowledgments)
Building code
Florida Building Code, 8th Edition (2023)
Owner-builder
If owner is acting as contractor, owner must sign owner-builder disclosure affidavit and must either perform the work personally or hire licensed contractors for applicable trades.
Contractor requirements
Contractors must register with Town, hold current licenses and insurance, and complete registration before work proceeds.
§ 03

Application process

Typical processing: Variable; check iWorQ portal for current status.

  1. 01
    Review Town of Fort Myers Beach permit requirements and identify applicable permit type.
  2. 02
    Consult comprehensive applications-and-forms library covering commercial, residential, interior remodel, trade, demolition, pools, windows and doors, docks and shore, fences, site work, signs, driveway and right-of-way, private providers, and supplemental forms.
  3. 03
    Prepare application materials and construction documents.
  4. 04
    Have all applications notarized.
  5. 05
    If project value exceeds $5,000, record Notice of Commencement with Lee County Clerk.
  6. 06
    If owner is acting as contractor, sign owner-builder disclosure affidavit and ensure owner will perform work personally or hire licensed contractors.
  7. 07
    Ensure contractor registration, licenses, and insurance are current before work proceeds.
  8. 08
    Submit application through iWorQ portal.
  9. 09
    Pay required fees.
  10. 10
    Town staff reviews for compliance with building codes and zoning requirements.
  11. 11
    If site-disturbing work applies, comply with stormwater pollution prevention planning and local impervious-surface retention standards.
  12. 12
    If floodplain or coastal requirements apply, submit V-zone certificates, elevation certificates, substantial-improvement cost forms, and floodplain acknowledgments.
  13. 13
    Respond to plan-review comments if required.
  14. 14
    Request inspections through iWorQ portal using permit number and access code.
  15. 15
    Pass all required inspections.
  16. 16
    Once final inspections pass, town issues permits, inspections results, and printed job-site plans through iWorQ.

Typical processing time: Variable; check iWorQ portal for current status.

Source: Town of Fort Myers Beach Building Services ↗

§ 04

Fee schedule

Fort Myers Beach building permit fees

Fee type
Amount
01
Permit fee formula
Consult Town for fee schedule.

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule

Typical sequence: Permit numbers are created in iWorQ once a complete application is received. Permit holder receives access code via email for inspection scheduling and results.

Source: Town of Fort Myers Beach Building Services ↗

§ 06

Frequently asked

Common questions about Fort Myers Beach permits

01 Do I need a building permit in Fort Myers Beach, FL?
Building permits are required for all construction, alteration, repair, and demolition work in the Town of Fort Myers Beach.
02 How much does a building permit cost in Fort Myers Beach, FL?
Building permit fees in Fort Myers Beach, FL are set by the local building department and vary by project type and valuation. Fees are calculated as: Consult Town for fee schedule..
03 How do I apply for a building permit in Fort Myers Beach, FL?
To apply for a building permit in Fort Myers Beach, FL, follow these steps: 1. Review Town of Fort Myers Beach permit requirements and identify applicable permit type. 2. Consult comprehensive applications-and-forms library covering commercial, residential, interior remodel, trade, demolition, pools, windows and doors, docks and shore, fences, site work, signs, driveway and right-of-way, private providers, and supplemental forms. 3. Prepare application materials and construction documents. 4. Have all applications notarized. 5. If project value exceeds $5,000, record Notice of Commencement with Lee County Clerk. 6. If owner is acting as contractor, sign owner-builder disclosure affidavit and ensure owner will perform work personally or hire licensed contractors. 7. Ensure contractor registration, licenses, and insurance are current before work proceeds. 8. Submit application through iWorQ portal. 9. Pay required fees. 10. Town staff reviews for compliance with building codes and zoning requirements. 11. If site-disturbing work applies, comply with stormwater pollution prevention planning and local impervious-surface retention standards. 12. If floodplain or coastal requirements apply, submit V-zone certificates, elevation certificates, substantial-improvement cost forms, and floodplain acknowledgments. 13. Respond to plan-review comments if required. 14. Request inspections through iWorQ portal using permit number and access code. 15. Pass all required inspections. 16. Once final inspections pass, town issues permits, inspections results, and printed job-site plans through iWorQ.
04 How long does it take to get a building permit in Fort Myers Beach, FL?
Building permit processing times in Fort Myers Beach, FL typically run Variable; check iWorQ portal for current status.. Timelines can vary based on project complexity and current department workload.
05 How do I schedule a building inspection in Fort Myers Beach, FL?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Fort Myers Beach, FL via: iWorQ permit portal, inspections@fmbgov.com.
last verified April 2026 source Town of Fort Myers Beach Building Services ↗ entry id permits/florida/lee/fort-myers-beach

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Fort Myers Beach Building Services before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Lee County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Lee County jurisdictions →