On this page 6
When a permit is required
Permit triggers and exempt work for Orchard Mesa
Required for most construction under Mesa County administration. Separate permits are required for separate buildings, structures, pools, and retaining walls.
- Exempt Fences under 7 feet
- Exempt Retaining walls under 4 feet
- Exempt Finish work
- Exempt Swings and playground equipment
- Exempt Plastic covered crop production shelters where public access is prohibited
- Exempt Roofing overlay over a single layer and repairs less than 100 square feet
- Exempt Small detached accessory structures within published thresholds
- Exempt Certain low-profile decks, sidewalks, driveways, and platforms
Note: Confirm specific exemptions with Mesa County Building Department.
- Completed application
- Plan set and checklist items
- Assessor characteristics form where required
- Sewer or septic clearance
- Planning clearance
- Gamma radiation survey where footprint is created or to-ground demolition occurs
- Additional agency clearances as applicable
- Building code
- Mesa County Ordinance 008(D) summary states adoption of the county's 2024 code package.
- Permit validity
- Permits become null and void if the project is not commenced and progress verified by an inspector every 180 days.
- Owner-builder
- Residential homeowners may perform electrical and plumbing work; otherwise those trades must be done by persons licensed by the State of Colorado.
- Contractor requirements
- County sources do not show a separate countywide general contractor license; state plumbing and electrical licensing applies.
Application process
Application → plan check → issuance → inspection → final
- 01 Verify whether the property is in unincorporated Mesa County or inside Grand Junction city limits.
- 02 If unincorporated, submit through the Mesa County Customer Portal with required plans, forms, and clearances.
- 03 Add any required planning, sewer, septic, or fire clearances identified by county staff or the permit checklist.
- 04 Respond to review comments and submit revisions through the portal.
- 05 Pay fees, obtain the permit, and schedule inspections with Mesa County.
Fee schedule
Effective 2024
Permit issuance after 4:30 p.m. is limited.
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2024) before budgeting.
Required inspections
Scheduling and sequence
- Mesa County Customer Portal (online)
- 970-256-1564 (phone)
- 844-987-4628 (text)
- Scheduling deadline
- Same-day or next-business-day if requested by 7:00 a.m.; later requests within two business days.
Typical sequence: Foundation, framing, rough trades, insulation, roof or specialty inspections as needed, and final.
Frequently asked
Common questions about Orchard Mesa permits
01 Do I need a building permit in Orchard Mesa, CO? ▸
02 How much does a building permit cost in Orchard Mesa, CO? ▸
03 How do I apply for a building permit in Orchard Mesa, CO? ▸
04 What work is exempt from building permits in Orchard Mesa, CO? ▸
05 How do I schedule a building inspection in Orchard Mesa, CO? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Mesa County Building Department before applying. Jaspector is not legal advice.