jaspector
City building permits

City of Lincoln

How to apply for a building permit in City of Lincoln, Arkansas. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

City of Lincoln

Street address
101 E Bean Street, Lincoln, AR 72744
Coverage
A small city in southwest Washington County. Building permits administered through city administration.
Online portal
Forms
§ 02

When a permit is required

Permit triggers and exempt work for Lincoln

Any owner of land in Lincoln must obtain a building permit before constructing, remodeling, altering, reroofing, or performing structural work on any building or structure.

Portable buildings
  • Exempt Portable buildings
Required documents
  • Application in duplicate with all required details (applicant name, mailing address, phone number, building type, location, outside dimensions, construction materials, proposed start date)
Permit validity
90 days from date of issue. Permit becomes void if construction has not begun within 90 days, unless renewed.
Owner-builder
Owners may apply directly.
Contractor requirements
Arkansas state licensing applies. Contact City Hall for specifics.
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Obtain a Building Permit Application from lincolnarkansas.com/forms or at City Hall.
  2. 02
    Complete the application in duplicate, including: applicant name, mailing address, phone number, type of building, location, outside dimensions, construction materials for foundation/floor/exterior walls, proposed construction start date.
  3. 03
    Submit duplicate copies to the Mayor or City Hall.
  4. 04
    Await review and approval.
  5. 05
    Permit issued; begin construction within 90 days of issuance.

Source: City of Lincoln ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • (479) 824-4274 (phone)
§ 05

Frequently asked

Common questions about Lincoln permits

01 Do I need a building permit in Lincoln, AR?
Any owner of land in Lincoln must obtain a building permit before constructing, remodeling, altering, reroofing, or performing structural work on any building or structure.
02 How do I apply for a building permit in Lincoln, AR?
To apply for a building permit in Lincoln, AR, follow these steps: 1. Obtain a Building Permit Application from lincolnarkansas.com/forms or at City Hall. 2. Complete the application in duplicate, including: applicant name, mailing address, phone number, type of building, location, outside dimensions, construction materials for foundation/floor/exterior walls, proposed construction start date. 3. Submit duplicate copies to the Mayor or City Hall. 4. Await review and approval. 5. Permit issued; begin construction within 90 days of issuance.
03 What work is exempt from building permits in Lincoln, AR?
Not all construction work requires a permit in Lincoln, AR. The following work is generally exempt: Portable buildings. When in doubt, confirm with the local building department before starting work.
04 How do I schedule a building inspection in Lincoln, AR?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Lincoln, AR via: (479) 824-4274.
last verified April 2026 source City of Lincoln ↗ entry id permits/arkansas/washington/lincoln

Educational reference. Permit rules and fees change — confirm current requirements directly with City of Lincoln before applying. Jaspector is not legal advice.