On this page 6
When a permit is required
Permit triggers and exempt work for Bella Vista
Construction, enlargement, alteration, repair, moving, removal, improvement, conversion, or demolition of any building or structure, from a small shed to a house.
- Exempt Minor repairs and maintenance per adopted Arkansas Fire Prevention Code.
Note: Consult building@bellavistaar.gov for confirmation.
- Site plan
- Floor plan
- Construction drawings
- Exterior elevations
- See Residential Building Permit Package 2023 PDF.
- Building code
- 2021 Arkansas Fire Prevention Code Volumes I, II, and III (IBC, IRC, IFC with Arkansas amendments); Plumbing, Mechanical, Electrical, and Energy Codes.
- Permit validity
- Permits are valid for 180 days; each approved inspection extends validity by 180 days.
- Contractor requirements
- Arkansas contractor license required.
Application process
Application → plan check → issuance → inspection → final
- 01 Download application package from the city website or access the online portal.
- 02 Complete the application including site plan, floor plan, exterior elevations, and other required documents.
- 03 Submit online, in person at 101 Town Center, or by email to building@bellavistaar.gov.
- 04 Pay applicable fees.
- 05 Plans are reviewed; applicant notified.
- 06 Permit is issued; post permit on site. Work must begin within 180 days of permit issuance.
- 07 Schedule inspections 24 hours in advance by calling (479) 268-4980, emailing permits@bellavistaar.gov, or via the online portal.
- 08 Pass all required inspections; each scheduled inspection extends the permit by 180 days.
Source: Building Division, Community Development Department, City of Bella Vista ↗
Fee schedule
Effective 2023
Fees change periodically. Confirm at the official fee schedule ↗ (effective 2023) before budgeting.
Required inspections
Scheduling and sequence
- (479) 268-4980 (phone)
- permits@bellavistaar.gov (email)
- Online portal (online)
- Scheduling deadline
- 24 hours in advance.
- Inspection hours
- Monday through Friday, 8:00 AM to 5:00 PM.
Typical sequence: Footing, slab, framing, rough-in MEP, insulation, final.
Frequently asked
Common questions about Bella Vista permits
01 Do I need a building permit in Bella Vista, AR? ▸
02 How much does a building permit cost in Bella Vista, AR? ▸
03 How do I apply for a building permit in Bella Vista, AR? ▸
04 What work is exempt from building permits in Bella Vista, AR? ▸
05 How do I schedule a building inspection in Bella Vista, AR? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Division, Community Development Department, City of Bella Vista before applying. Jaspector is not legal advice.