On this page 6
When a permit is required
Permit triggers and exempt work for Dewey-Humboldt
Building permits are required for most construction projects within the Town of Dewey-Humboldt.
- Exempt Garage up to 400 square feet with no electricity or plumbing
Note: Even if exempt from building permit, a zoning clearance permit is still required.
- Building code
- 2018 IRC, 2017 NEC, 2006 IECC
- Permit validity
- Permits are typically good for two years. Approved inspections every 180 days are required.
Application process
Typical processing: Typically approved in one to two weeks.
- 01 Call Building Safety at (928) 632-7362 to discuss the project in advance.
- 02 Download applicable permit packet and application materials.
- 03 Prepare required documents and construction plans.
- 04 Submit application and documents through permit system.
- 05 Obtain approved septic permit from Yavapai County before town will begin reviewing building plans.
- 06 Pay permit fees upon approval.
- 07 Schedule inspections as required.
Typical processing time: Typically approved in one to two weeks.
Fee schedule
Dewey-Humboldt building permit fees
Required inspections
Scheduling and sequence
- (928) 632-7362 (phone)
- Scheduling deadline
- 24 hours notice required for an inspection. Messages may be left after hours.
- Inspection hours
- Monday-Friday
Frequently asked
Common questions about Dewey-Humboldt permits
01 Do I need a building permit in Dewey-Humboldt, AZ? ▸
02 How much does a building permit cost in Dewey-Humboldt, AZ? ▸
03 How do I apply for a building permit in Dewey-Humboldt, AZ? ▸
04 How long does it take to get a building permit in Dewey-Humboldt, AZ? ▸
05 What work is exempt from building permits in Dewey-Humboldt, AZ? ▸
06 How do I schedule a building inspection in Dewey-Humboldt, AZ? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Dewey-Humboldt Building Safety before applying. Jaspector is not legal advice.