When a permit is required
Permit triggers and exempt work for Mills
Required for new construction, additions, alterations, and remodels to structures. A zoning certification application is also required for applicable projects.
- Completed permit application form
- Site plan required if building new or adding to the outside of a structure
- Zoning certificate required for new construction and exterior additions (case by case)
- Building code
- 2021 International Codes (with local amendments) including: International Residential Code, International Building Code, International Plumbing Code, International Mechanical Code, International Fuel Gas Code, International Fire Code, and 2023 National Electrical Code.
- Contractor requirements
- Contact Building Inspector Kevin O'Hearn at (307) 234-6679 or kohearn@millswy.gov for contractor licensing information.
Application process
Typical processing: 24 to 72 hours.
- 01 Download the appropriate permit application from the Town website or pick up a form at Town Hall.
- 02 Complete the application and attach required documents (site plan and/or zoning certificate required for new construction or exterior additions as a general rule).
- 03 Submit the completed application and documents to Town Hall at 704 Fourth Street, or fax for mechanical, plumbing, and re-roofing permits.
- 04 Staff reviews the application. Approval process may take 24 to 72 hours.
- 05 Payment of fees is due either at submission or upon approval depending on permit type.
- 06 Upon approval, permit is issued. Post the permit on-site.
- 07 Schedule required inspections by calling (307) 234-6679 or emailing info@millswy.gov.
- 08 Pass all required inspections and obtain certificate of occupancy when all inspections are complete.
Typical processing time: 24 to 72 hours.
Fee schedule
Effective FY24
Fees are due either at submission or upon approval depending on permit type.
Fees change periodically. Confirm at the official fee schedule ↗ (effective FY24) before budgeting.
Required inspections
Scheduling and sequence
- (307) 234-6679 (phone)
- info@millswy.gov (email)
Frequently asked
Common questions about Mills permits
01 Do I need a building permit in Mills, WY? ▸
02 How much does a building permit cost in Mills, WY? ▸
03 How do I apply for a building permit in Mills, WY? ▸
04 How long does it take to get a building permit in Mills, WY? ▸
05 How do I schedule a building inspection in Mills, WY? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building and Inspections Department before applying. Jaspector is not legal advice.