jaspector
City building permits

Town of Dubois

How to apply for a building permit in Town of Dubois, Wyoming. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 5
§ 01

Permit authority

Town of Dubois (Planning and Zoning / Town Clerk)

Street address
616 Ramshorn Street, Dubois, WY 82513
Coverage
Dubois administers permits within its incorporated town limits. The town is located at the eastern gateway to the Wind River Range and Shoshone National Forest, approximately 50 miles east of Grand Teton National Park via the Togwotee Pass corridor. Parcels outside town limits fall under Fremont County jurisdiction.
Online portal
Town of Dubois
§ 02

When a permit is required

Permit triggers and exempt work for Dubois

New construction, additions, and structural alterations within town limits require permits. Contact Town Hall to confirm current thresholds.

Small structure exemption: Likely similar to county thresholds; confirm with town.
  • Exempt Small structure exemption: Likely similar to county thresholds; confirm with town.
Required documents
  • Application form
  • Site plan
  • Basic construction drawings
Building code
Dubois may or may not have formally adopted the IRC/IBC. Given its small size, it is possible that residential code enforcement is minimal. Confirm current code adoption status by calling 307-455-2774.

Source: Town of Dubois (Planning and Zoning / Town Clerk) ↗

§ 03

Application process

Typical processing: For a small town, turnaround is often quick for standard residential work.

  1. 01
    Call Dubois Town Hall at 307-455-2774 to speak with the Town Clerk or relevant planning/building contact about your project.
  2. 02
    Confirm the parcel is within town limits. Use Fremont County GIS or contact the county if uncertain.
  3. 03
    Obtain a permit application form from Town Hall.
  4. 04
    Submit application with required documents in person.
  5. 05
    Pay the permit fee.
  6. 06
    Permit reviewed and issued by town staff.
  7. 07
    Schedule inspections by calling Town Hall.
  8. 08
    Separate Wyoming state electrical permit required through Division of Labor.
  9. 09
    Final inspection; occupancy documentation issued.

Typical processing time: For a small town, turnaround is often quick for standard residential work.

Source: Town of Dubois (Planning and Zoning / Town Clerk) ↗

§ 04

Required inspections

Scheduling and sequence

How to schedule
  • By phone at 307-455-2774 (phone)
Inspection hours
Limited; call to confirm.

Typical sequence: Basic foundation, framing, and final inspections for residential; state electrical inspections separate. For complex commercial projects, the town may contract with Fremont County or a third-party building official for inspections.

Source: Town of Dubois (Planning and Zoning / Town Clerk) ↗

§ 05

Frequently asked

Common questions about Dubois permits

01 Do I need a building permit in Dubois, WY?
New construction, additions, and structural alterations within town limits require permits. Contact Town Hall to confirm current thresholds.
02 How do I apply for a building permit in Dubois, WY?
To apply for a building permit in Dubois, WY, follow these steps: 1. Call Dubois Town Hall at 307-455-2774 to speak with the Town Clerk or relevant planning/building contact about your project. 2. Confirm the parcel is within town limits. Use Fremont County GIS or contact the county if uncertain. 3. Obtain a permit application form from Town Hall. 4. Submit application with required documents in person. 5. Pay the permit fee. 6. Permit reviewed and issued by town staff. 7. Schedule inspections by calling Town Hall. 8. Separate Wyoming state electrical permit required through Division of Labor. 9. Final inspection; occupancy documentation issued.
03 How long does it take to get a building permit in Dubois, WY?
Building permit processing times in Dubois, WY typically run For a small town, turnaround is often quick for standard residential work.. Timelines can vary based on project complexity and current department workload.
04 What work is exempt from building permits in Dubois, WY?
Not all construction work requires a permit in Dubois, WY. The following work is generally exempt: Small structure exemption: Likely similar to county thresholds; confirm with town.. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Dubois, WY?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Dubois, WY via: By phone at 307-455-2774.
last verified April 2026 source Town of Dubois (Planning and Zoning / Town Clerk) ↗ entry id permits/wyoming/fremont/dubois

Educational reference. Permit rules and fees change — confirm current requirements directly with Town of Dubois (Planning and Zoning / Town Clerk) before applying. Jaspector is not legal advice.

§   Adjacent

Other jurisdictions in Fremont County.

Same county, different permit office. Click for that jurisdiction's full guide.

All Fremont County jurisdictions →