Town of Monico

How to apply for a building permit in Town of Monico, Wisconsin. Permit authority, application steps, fees, and inspection requirements.

Code adoption
Wisconsin UDC
Min. permit fee
$100
Last verified
April 2026
On this page 6
§ 01

Permit authority

Oneida County Planning and Zoning; Baas Inspection Agency LLC for new home/cottage inspections

Street address
County zoning at 1 S Oneida Ave, Rhinelander, WI 54501; Baas Inspection Agency LLC, 9695 Cty Rd A, Alvin, WI 54542
Coverage
Town of Monico
§ 02

When a permit is required

Permit triggers and exempt work for Monico

Monico is an unzoned town; county permits are required within 1000 ft of a lake, pond, or flowage or within 300 ft of a navigable stream or river for new construction, new impervious surfaces, and additions onto legal pre-existing structures.

County handout exemptions for ordinary maintenance and small structures
  • Exempt County handout exemptions for ordinary maintenance and small structures
Building code
Wisconsin UDC
Permit validity
Two years for county zoning permits
Contractor requirements
UDC rules apply
§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Confirm whether the work triggers county zoning.
  2. 02
    Apply to county zoning.
  3. 03
    Apply to Baas Inspection Agency for UDC new home/cottage work.
  4. 04
    Schedule inspections.

Source: Oneida County Planning and Zoning; Baas Inspection Agency LLC for new home/cottage inspections ↗

§ 04

Fee schedule

Monico building permit fees

Fee type
Amount
01
Minimum permit fee
$100
02
Permit fee formula
County square-footage formula
03
Reinspection fee
Return inspection fee $300

Fees change periodically. Confirm at the official fee schedule ↗ before budgeting.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • Baas Inspection Agency and county zoning (contact)
Inspection hours
County hours 8:00 AM to 4:30 PM, Monday through Friday

Typical sequence: Review, issue, inspect

County return inspection fee applies

§ 06

Frequently asked

Common questions about Monico permits

01 Do I need a building permit in Monico, WI? ▸
Monico is an unzoned town; county permits are required within 1000 ft of a lake, pond, or flowage or within 300 ft of a navigable stream or river for new construction, new impervious surfaces, and additions onto legal pre-existing structures.
02 How much does a building permit cost in Monico, WI? ▸
Building permit fees in Monico, WI are set by the local building department and vary by project type and valuation. The minimum permit fee is $100. Fees are calculated as: County square-footage formula.
03 How do I apply for a building permit in Monico, WI? ▸
To apply for a building permit in Monico, WI, follow these steps: 1. Confirm whether the work triggers county zoning. 2. Apply to county zoning. 3. Apply to Baas Inspection Agency for UDC new home/cottage work. 4. Schedule inspections.
04 What work is exempt from building permits in Monico, WI? ▸
Not all construction work requires a permit in Monico, WI. The following work is generally exempt: County handout exemptions for ordinary maintenance and small structures. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Monico, WI? ▸
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Monico, WI via: Baas Inspection Agency and county zoning.

Educational reference. Permit rules and fees change — confirm current requirements directly with Oneida County Planning and Zoning; Baas Inspection Agency LLC for new home/cottage inspections before applying. Jaspector is not legal advice.