How to apply for a building permit in City of Marysville, Washington. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

Community Development Services

Street address
1049 State Avenue, Marysville, WA 98270
Coverage
All properties within the incorporated City of Marysville.
Online portal
City of Marysville Online Permit System
Marysville Online Permit System
§ 02

When a permit is required

Permit triggers and exempt work for Marysville

A building permit is required for most construction in the City of Marysville.

Work exempt per IBC/IRC Section 105 as amended
  • Exempt Work exempt per IBC/IRC Section 105 as amended

Note: See Marysville Municipal Code 16.04.010(3) for amended exemption list. Exemptions do not authorize work in violation of code.

Required documents
  • Completed permit application
  • Plans and specifications
  • Application checklists as required by project type
Building code
2021 International Building Code (IBC) and International Residential Code (IRC) with Washington amendments and local amendments (effective March 15, 2024).
Contractor requirements
All contractors must be registered with Washington State L&I.

Source: Community Development Services ↗

§ 03

Application process

Typical processing: Varies by project complexity and current workload.

  1. 01
    Submit application through online portal or in-person.
  2. 02
    Pay plan review fee (65% of building permit fee) at submittal.
  3. 03
    Plan review process conducted by city staff.
  4. 04
    Pay remaining permit fees upon approval.
  5. 05
    Permit issued.

Typical processing time: Varies by project complexity and current workload.

Source: Community Development Services ↗

§ 04

Fee schedule

Marysville building permit fees

Fee type
Amount
01
Plan check fee
65% of building permit fee (paid at submittal)
02
Permit fee formula
Building valuation based on ICC Building Valuation Data (February 2023 issue with 1.03 annual cost modifier starting 2025). Single-wide mobile homes: 2 hour base fee; Double-wide: 3 hour base fee.
03
Reinspection fee
One hour of staff time

State Building Code Council Surcharge: $6.50 per building permit, plus $2.00 each dwelling unit, $25.00 for commercial. Revision Fee: One hour of staff time. Refund: Up to 70% if no review or work done; written request within 90 days required. Investigation Fee: Charged when work started prior to permit issuance.

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • 360-363-8100 (phone)

Typical sequence: Inspections required throughout construction. Reinspection fees apply for failed inspections or work not ready.

Source: Community Development Services ↗

§ 06

Frequently asked

Common questions about Marysville permits

01 Do I need a building permit in Marysville, WA?
A building permit is required for most construction in the City of Marysville.
02 How much does a building permit cost in Marysville, WA?
Building permit fees in Marysville, WA are set by the local building department and vary by project type and valuation. Fees are calculated as: Building valuation based on ICC Building Valuation Data (February 2023 issue with 1.03 annual cost modifier starting 2025). Single-wide mobile homes: 2 hour base fee; Double-wide: 3 hour base fee.. Plan check fee: 65% of building permit fee (paid at submittal).
03 How do I apply for a building permit in Marysville, WA?
To apply for a building permit in Marysville, WA, follow these steps: 1. Submit application through online portal or in-person. 2. Pay plan review fee (65% of building permit fee) at submittal. 3. Plan review process conducted by city staff. 4. Pay remaining permit fees upon approval. 5. Permit issued.
04 How long does it take to get a building permit in Marysville, WA?
Building permit processing times in Marysville, WA typically run Varies by project complexity and current workload.. Timelines can vary based on project complexity and current department workload.
05 What work is exempt from building permits in Marysville, WA?
Not all construction work requires a permit in Marysville, WA. The following work is generally exempt: Work exempt per IBC/IRC Section 105 as amended. Note: See Marysville Municipal Code 16.04.010(3) for amended exemption list. Exemptions do not authorize work in violation of code. When in doubt, confirm with the local building department before starting work.
06 How do I schedule a building inspection in Marysville, WA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Marysville, WA via: 360-363-8100.
last verified April 2026 source Community Development Services ↗ entry id permits/washington/snohomish/marysville

Educational reference. Permit rules and fees change — confirm current requirements directly with Community Development Services before applying. Jaspector is not legal advice.