When a permit is required
Permit triggers and exempt work for Stevenson
A building permit is required for all new construction, structural remodels, additions, roofing, plumbing, and mechanical work within the City of Stevenson. Electrical permits are obtained separately through Washington State L&I.
- Exempt One-story detached residential accessory structures used as tool and storage sheds, playhouses, and similar uses, with floor area not exceeding 200 square feet and no plumbing
- Exempt Fences not over 6 feet in height
- Exempt Retaining walls not over 4 feet in height (measured from bottom of footing to top of wall), not supporting surcharge
- Exempt Platforms, decks, sidewalks, and driveways not more than 30 inches above grade and not over any basement or story below
- Exempt Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
- Exempt Minor repairs: replacement of existing work in kind, provided no structural changes are made
Note: An exemption from a building permit does not exempt work from compliance with the applicable building code, zoning setback requirements, or other local, state, or federal requirements. Electrical work is always separately permitted through L&I regardless of building permit status.
- Site plan (template available for download)
- Floor plans and elevation drawings
- Structural plans and specifications
- Energy code compliance documentation (WSEC)
- System Development Charge (SDC) information for water and sewer connections
- For new construction or additions: sewer service lateral details, stormwater infiltration plan and downspout locations, water service line specifications and meter placement, complete fixture list, driveway specifications (ADA compliance)
- Building code
- 2021 International Building Code (IBC) with Washington State amendments (effective March 15, 2024). Also: International Residential Code (IRC), International Mechanical Code (IMC), Uniform Plumbing Code (UPC), International Fire Code (IFC), and Washington State Energy Code (WSEC).
- Permit validity
- Work must begin within 180 days of permit issuance; first inspection must occur within 180 days. No more than 180 days may elapse between any two consecutive inspections.
- Owner-builder
- Permit applications may be submitted by the property owner or a licensed/registered contractor.
- Contractor requirements
- All contractors must be registered with Washington State L&I. Contractor registration is separate from local permit requirements.
Application process
Typical processing: Varies by project complexity; typical plan review is 2–4 weeks. Contact Daniel Pitariu (Permit and Records Manager) at (509) 427-5970 ext. 203 or daniel@ci.stevenson.wa.us for guidance.
- 01 Create a Cloudpermit account at https://us.cloudpermit.com/dashboard.
- 02 Submit the application online, selecting the appropriate permit type (building, mechanical, plumbing, public works, or planning).
- 03 Upload required documents (site plan, floor plans, elevation drawings, structural plans, energy code documentation, and System Development Charge information).
- 04 Planning, Public Works, and the Skamania County Building Department review simultaneously through the portal.
- 05 Respond to any requests for additional information or revisions via the portal's messaging system.
- 06 Pay permit fees online by credit card once the permit is approved.
- 07 Download and post the permit card at the job site before work begins.
- 08 Schedule inspections through Cloudpermit at each required construction stage.
- 09 Upon final inspection approval, a Certificate of Occupancy (CO) is issued for new structures.
Typical processing time: Varies by project complexity; typical plan review is 2–4 weeks. Contact Daniel Pitariu (Permit and Records Manager) at (509) 427-5970 ext. 203 or daniel@ci.stevenson.wa.us for guidance.
Fee schedule
Effective August 1, 2023
Fees may be paid online through Cloudpermit by credit card. For fee estimate, email building@co.skamania.wa.us with project description and square footage.
Fees change periodically. Confirm at the official fee schedule ↗ (effective August 1, 2023) before budgeting.
Required inspections
Scheduling and sequence
- Cloudpermit portal (online)
- building@co.skamania.wa.us (email)
- (509) 427-3925 (phone)
- Inspection hours
- Monday – Thursday, 7:30 AM to 5:30 PM (closed Fridays)
Typical sequence: Typical residential new construction: footing/foundation (before concrete pour), framing/rough-in (before sheathing), rough plumbing and mechanical, insulation, energy code compliance, final inspection (all trades complete).
Frequently asked
Common questions about Stevenson permits
01 Do I need a building permit in Stevenson, WA? ▸
02 How much does a building permit cost in Stevenson, WA? ▸
03 How do I apply for a building permit in Stevenson, WA? ▸
04 How long does it take to get a building permit in Stevenson, WA? ▸
05 What work is exempt from building permits in Stevenson, WA? ▸
06 How do I schedule a building inspection in Stevenson, WA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City of Stevenson — Permit Center (Building services contracted to Skamania County Building Division) before applying. Jaspector is not legal advice.