When a permit is required
Permit triggers and exempt work for University Place
A building permit is required for construction within the City of University Place.
- Exempt One-story detached accessory structures under 200 sq ft
- Exempt Minor interior alterations not affecting structural components
- Exempt Fences under height limits
- Exempt Retaining walls under specified heights
Note: Standard IRC/IBC exemptions apply. Confirm edge cases with Planning and Development Services before proceeding.
- Completed permit application
- Scaled site plan showing property dimensions, easements, and structures
- Plumbing plans
- Mechanical plans
- Energy code details
- Window schedule with U-Factors
- Building code
- 2021 Washington State Building Code with amendments.
- Permit validity
- Building permits are valid for 180 days from issuance unless extended.
- Owner-builder
- Homeowners may act as owner-builders; confirm requirements with Planning and Development Services.
- Contractor requirements
- All contractors must be registered with Washington State L&I. Complete, legible plans required meeting current codes. Seismic Design Category: D1 (IRC) or D (IBC). Snow Load: 25 pounds per square foot. Basic Wind Speed: 80 mph. Exposure: Mostly B, some areas C and D facing Puget Sound.
Application process
Typical processing: Processing time varies by project complexity.
- 01 Check Development Specifications & Design Standards for infrastructure requirements.
- 02 Review Zoning Code for allowable uses and standards.
- 03 Submit preliminary plans to identify potential code conflicts (encouraged).
- 04 Complete permit application with all required details including plumbing, mechanical, energy, and window details.
- 05 Submit complete, legible plans meeting current codes.
- 06 Provide scaled site plan showing property dimensions, easements, and structures.
Typical processing time: Processing time varies by project complexity.
Fee schedule
Effective Verify current effective date with Planning and Development Services
Fees paid through online system or at city offices.
Required inspections
Scheduling and sequence
- Scheduling deadline
- Schedule inspections as required throughout project.
- Inspection hours
- Monday-Friday during business hours (confirm with city)
- Time windows
- Inspection windows vary by project phase.
Typical sequence: Final inspection required for Certificate of Occupancy.
Contact Planning and Development Services for remote inspection options.
Frequently asked
Common questions about University Place permits
01 Do I need a building permit in University Place, WA? ▸
02 How much does a building permit cost in University Place, WA? ▸
03 How do I apply for a building permit in University Place, WA? ▸
04 How long does it take to get a building permit in University Place, WA? ▸
05 What work is exempt from building permits in University Place, WA? ▸
06 How do I schedule a building inspection in University Place, WA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Planning and Development Services before applying. Jaspector is not legal advice.