When a permit is required
Permit triggers and exempt work for Fircrest
A building permit is required for construction within the City of Fircrest.
- Exempt One-story detached accessory structures under 200 sq ft (sheds, playhouses)
- Exempt Fences not over 6 feet high
- Exempt Retaining walls not over 4 feet high (unless supporting surcharge)
- Exempt Water tanks under 5,000 gallons
- Exempt Sidewalks and driveways
- Exempt Painting, papering, tiling, carpeting, cabinets, countertops
- Exempt Prefabricated pools less than 24 inches deep
- Exempt Swings and playground equipment
- Exempt Window awnings projecting less than 54 inches
- Exempt Decks not exceeding 200 sq ft, not over 30 inches above grade, not attached
Note: Even exempt work must comply with construction and zoning codes.
- Completed permit application (PDF format required)
- Complete set of plans
- Site Sketch/Site Plan (two sets)
- Window schedule with U-Factors (for window projects)
- Glazing schedule with diagram (for window projects)
- Building code
- 2021 Washington State Building Code with amendments.
- Permit validity
- Building permits are valid for 180 days from issuance unless extended.
- Owner-builder
- Owner or chosen representative may draw plans if clear and detailed.
- Contractor requirements
- All contractors must be registered with Washington State L&I. Complex projects may require professional engineer. Windows: Building permit + Glazing Schedule with U-Factors + diagram of window locations. Decks: Permit required if exceeds 200 sq ft, 30+ inches above grade, or attached to dwelling.
Application process
Typical processing: Processing time varies by project complexity.
- 01 Email required documents in PDF format to permits@cityoffircrest.net
- 02 Staff will notify when permit is ready to be picked up and fee is due.
- 03 Pay fees through specified payment methods.
- 04 Pick up permit.
- 05 Schedule inspections online or by phone.
Typical processing time: Processing time varies by project complexity.
Fee schedule
Effective Verify current effective date with Planning and Building Department
Contact city for payment methods.
Required inspections
Scheduling and sequence
- Code Pros (Sierra Barth) (phone)
- Online scheduling through city website (online)
- Scheduling deadline
- Schedule by 2:30 p.m. the previous day.
- Inspection hours
- Tuesday and Thursday, 10:00 a.m. - 2:00 p.m.
- Time windows
- Standard inspections during scheduled windows.
Typical sequence: Inspections required at various construction phases.
Contact city for remote inspection options.
Frequently asked
Common questions about Fircrest permits
01 Do I need a building permit in Fircrest, WA? ▸
02 How much does a building permit cost in Fircrest, WA? ▸
03 How do I apply for a building permit in Fircrest, WA? ▸
04 How long does it take to get a building permit in Fircrest, WA? ▸
05 What work is exempt from building permits in Fircrest, WA? ▸
06 How do I schedule a building inspection in Fircrest, WA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Planning and Building Department before applying. Jaspector is not legal advice.