When a permit is required
Permit triggers and exempt work for Hoquiam
A building permit is required for all construction within the City of Hoquiam.
- Exempt Driveways
- Exempt Decks under 200 square feet if under 3 feet tall and not attached to house
- Exempt Small accessory sheds/buildings under 120 square feet
- Exempt Finish work: cabinetry, painting, floor covering
- Exempt Roofing and siding (classified as maintenance for floodplain calculations)
Note: Work exempt from building permit may still require other permits.
- Site plan
- Architectural plans
- Structural Engineering for gravity and lateral loading
- Truss engineering and layout
- I-joist plans from manufacturer
- Deck/Porch plans
- Building code
- International Building Code (IBC) with Washington State amendments
- Contractor requirements
- Washington State L&I registration required.
Source: Building Division ↗
Application process
Typical processing: 1-8 weeks for plan review, depending on project size and submittal accuracy.
- 01 Register on the SmartGov Community online portal
- 02 Complete electronic application for desired permit type
- 03 Upload submittal documents in PDF format
- 04 Allow 2-5 business days for email response on application status
- 05 Participate in plan review (1-8 weeks depending on project size and submittal accuracy)
- 06 All permits are reviewed before payment and issuance
- 07 Pay fees online or in-person at City Hall
- 08 Schedule inspections through portal
Typical processing time: 1-8 weeks for plan review, depending on project size and submittal accuracy.
Source: Building Division ↗
Fee schedule
Hoquiam building permit fees
Online credit card (with convenience fee) or in-person at City Hall 1st floor. Mailed checks payable to City of Hoquiam, mailed to 609 8th Street, Hoquiam, WA 98550, c/o Building Division.
Required inspections
Scheduling and sequence
- SmartGov portal (online)
- Scheduling deadline
- Must be requested by 4:00 PM day before needed.
- Inspection hours
- Monday, Wednesday, Friday only, 9:00 AM - 3:00 PM (office & lunch block 11:30 AM - 1:30 PM).
Source: Building Division ↗
Frequently asked
Common questions about Hoquiam permits
01 Do I need a building permit in Hoquiam, WA? ▸
02 How much does a building permit cost in Hoquiam, WA? ▸
03 How do I apply for a building permit in Hoquiam, WA? ▸
04 How long does it take to get a building permit in Hoquiam, WA? ▸
05 What work is exempt from building permits in Hoquiam, WA? ▸
06 How do I schedule a building inspection in Hoquiam, WA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Building Division before applying. Jaspector is not legal advice.