How to apply for a building permit in City of Bridgeport, Washington. Permit authority, application steps, fees, and inspection requirements.

Last verified
April 2026
On this page 6
§ 01

Permit authority

City Hall (contracted with Blades Code Services)

Street address
1206 Columbia Ave., P.O. Box 640, Bridgeport, WA 98813
Coverage
All properties within the incorporated City of Bridgeport. Bridgeport is located on the Columbia River in the north part of Douglas County adjacent to Chief Joseph Dam. Electrical permits are obtained from Washington State L&I, not the city.
Online portal
Building Permit Application
Paper-based
Additional resources
§ 02

When a permit is required

Permit triggers and exempt work for Bridgeport

A building permit is required for new construction, additions, alterations affecting structure, mechanical, plumbing, and gas system installation, and demolition.

One-story detached accessory structures (tool sheds, playhouses) up to 200 sq ft with no plumbing or sleeping accommodations
Minor repairs and maintenance
Minor plumbing repairs (stopping leaks, clearing stoppages)
Minor mechanical repairs (replacement parts)
Portable fuel-cell or heating appliances not connected to fixed systems
  • Exempt One-story detached accessory structures (tool sheds, playhouses) up to 200 sq ft with no plumbing or sleeping accommodations
  • Exempt Minor repairs and maintenance
  • Exempt Minor plumbing repairs (stopping leaks, clearing stoppages)
  • Exempt Minor mechanical repairs (replacement parts)
  • Exempt Portable fuel-cell or heating appliances not connected to fixed systems

Note: Contact City Hall for any Bridgeport-specific local exemptions. Even exempt work must comply with setback requirements, shoreline regulations (Columbia River shoreline), and other local ordinances.

Required documents
  • Completed Building Permit Application
  • Site plan
  • Construction plans (floor plan, elevations, foundation, framing)
  • Energy compliance documentation (per 2021 IECC with WA amendments)
Building code
2021 International Building Code (IBC), IRC, IMC, IPC, IFGC, IECC, and IWUIC with Washington State amendments, effective March 15, 2024. Bridgeport Municipal Code is current through Ordinance 744 (passed July 16, 2025).
Owner-builder
Property owners may perform their own work without contractor registration for personal-use projects (not for resale).
Contractor requirements
Contractors must hold valid Washington State L&I registration. No permit may be issued for work by a third-party contractor unless the contractor is registered with L&I and in good standing.

Source: City Hall (contracted with Blades Code Services) ↗

§ 03

Application process

Application → plan check → issuance → inspection → final

  1. 01
    Download the Building Permit Application (PDF) from the city website or pick up at City Hall.
  2. 02
    Prepare required documents: site plan, construction plans (floor plan, elevations, foundation, framing), and energy compliance documentation per 2021 IECC with WA amendments.
  3. 03
    Submit in person at 1206 Columbia Ave during office hours (Monday-Friday, 8:30 AM to 12:00 PM and 1:00 PM to 4:30 PM).
  4. 04
    Bridgeport contracts with Blades Code Services for plan review and inspections.
  5. 05
    Upon approval and fee payment, permit is issued.
  6. 06
    Schedule inspections through Blades Code Services.

Source: City Hall (contracted with Blades Code Services) ↗

§ 04

Fee schedule

Bridgeport building permit fees

Fee type
Amount
01
Permit fee formula
Specific fee amounts for Bridgeport building permits were not publicly available. Blades Code Services contract likely includes a schedule for inspection and plan review fees.

Contact City Hall at (509) 686-4041 for the current fee schedule. State surcharge of $6.50 per residential permit or $25.00 per commercial permit applies. Online payments available through InvoiceCloud: https://www.invoicecloud.com/bridgeport

§ 05

Required inspections

Scheduling and sequence

How to schedule
  • (509) 686-4041 (phone)
Inspection hours
Monday-Friday, 8:30 AM to 12:00 PM and 1:00 PM to 4:30 PM

Typical sequence: Inspections are conducted by Blades Code Services under contract with the City of Bridgeport. Typical inspection stages: Foundation/footing before pour, Framing before insulation, Mechanical and plumbing rough-in, Final inspection (required before occupancy).

Source: City Hall (contracted with Blades Code Services) ↗

§ 06

Frequently asked

Common questions about Bridgeport permits

01 Do I need a building permit in Bridgeport, WA?
A building permit is required for new construction, additions, alterations affecting structure, mechanical, plumbing, and gas system installation, and demolition.
02 How much does a building permit cost in Bridgeport, WA?
Building permit fees in Bridgeport, WA are set by the local building department and vary by project type and valuation. Fees are calculated as: Specific fee amounts for Bridgeport building permits were not publicly available. Blades Code Services contract likely includes a schedule for inspection and plan review fees..
03 How do I apply for a building permit in Bridgeport, WA?
To apply for a building permit in Bridgeport, WA, follow these steps: 1. Download the Building Permit Application (PDF) from the city website or pick up at City Hall. 2. Prepare required documents: site plan, construction plans (floor plan, elevations, foundation, framing), and energy compliance documentation per 2021 IECC with WA amendments. 3. Submit in person at 1206 Columbia Ave during office hours (Monday-Friday, 8:30 AM to 12:00 PM and 1:00 PM to 4:30 PM). 4. Bridgeport contracts with Blades Code Services for plan review and inspections. 5. Upon approval and fee payment, permit is issued. 6. Schedule inspections through Blades Code Services.
04 What work is exempt from building permits in Bridgeport, WA?
Not all construction work requires a permit in Bridgeport, WA. The following work is generally exempt: One-story detached accessory structures (tool sheds, playhouses) up to 200 sq ft with no plumbing or sleeping accommodations; Minor repairs and maintenance; Minor plumbing repairs (stopping leaks, clearing stoppages); Minor mechanical repairs (replacement parts); Portable fuel-cell or heating appliances not connected to fixed systems. Note: Contact City Hall for any Bridgeport-specific local exemptions. Even exempt work must comply with setback requirements, shoreline regulations (Columbia River shoreline), and other local ordinances. When in doubt, confirm with the local building department before starting work.
05 How do I schedule a building inspection in Bridgeport, WA?
Once your permit is issued and work reaches an inspection milestone, you can schedule a building inspection in Bridgeport, WA via: (509) 686-4041.
last verified April 2026 source City Hall (contracted with Blades Code Services) ↗ entry id permits/washington/douglas/bridgeport

Educational reference. Permit rules and fees change — confirm current requirements directly with City Hall (contracted with Blades Code Services) before applying. Jaspector is not legal advice.