On this page 6
When a permit is required
Permit triggers and exempt work for Leavenworth
Building permits required for most construction projects within the City of Leavenworth.
Note: Most construction projects require a permit unless specifically exempted by Section 105 of the International Residential Code or International Building Code. Zoning regulations apply regardless of permit exemption.
- Completed Building Permit Application
- Site plan drawn to scale using Site Plan Checklist
- Building plans including floor plans, elevation profiles, footing and foundation plans, cross sections, framing details, mechanical and plumbing plans
- Engineering calculations
- WA State Residential Energy Code Compliance Worksheets
- Water Connection Application (if applicable)
- Sewer Connection Application (if applicable)
- Driveway Permit Application (if applicable)
- Stormwater plan (if applicable)
- Utility Plan (water, sewer, stormwater)
- Building code
- 2021 International Building Code (IBC), International Residential Code (IRC), International Mechanical Code (IMC) with Washington State amendments (effective March 2024), as listed in LMC 15.04
- Permit validity
- Work must begin and be inspected within 180 days of permit issuance to keep permit active.
- Owner-builder
- Owner-builder work shall NOT be performed for purpose of leasing or selling.
- Contractor requirements
- Contractor must be licensed by State and City when construction is done by someone other than owner.
Source: Community Development Department, Building Division ↗
Application process
Typical processing: Initial plan check typically 2-4 weeks; resubmittals add additional time depending on scope of corrections.
- 01 Pre-submittal consultation recommended: Contact building@cityofleavenworth.com to review your project and identify required permits
- 02 Ensure all buildings have assigned addresses; contact City if a new address is needed
- 03 Create an account on the online permit portal at www.cityofleavenworth.com and click 'Permit Portal'
- 04 Select 'View Permits, or Submit a Permit for Review' and choose Community Development
- 05 Click 'SIGN IN / REGISTER' to create an account or sign in; new users must register first
- 06 Scroll to 'APPLY ONLINE' and select 'Click to Apply Online'
- 07 Agree to terms and conditions and select permit type
- 08 Prepare and upload all required documents: Site Plan (using checklist), Building Plans, Engineering Calculations, WA State Energy Code Compliance Forms, and any necessary reports (stormwater plan, geo assessment, wetland delineation)
- 09 Submit application with permit deposit (dollar amount provided by City)
- 10 City staff reviews completeness and routes for plan review
- 11 Respond to correction comments and upload revised documents
- 12 Pay all remaining fees upon permit issuance before starting work
Typical processing time: Initial plan check typically 2-4 weeks; resubmittals add additional time depending on scope of corrections.
Source: Community Development Department, Building Division ↗
Fee schedule
Leavenworth building permit fees
Pass-through fees for outside consultants may apply. Staff time may be billed including reviewing plans, routing, site visits, and consultations.
Required inspections
Scheduling and sequence
- (509) 548-5275 (phone)
- Scheduling deadline
- Inspections must be requested at least one day prior, before 4:00 PM.
- Inspection hours
- Monday-Friday (hours to be confirmed with Community Development)
Typical sequence: Typical sequence: Foundation/Footings, Framing, Plumbing rough-in, Mechanical rough-in, Electrical rough-in (L&I), Insulation, Final inspection. All permit-related documents available through online permit portal. Projects not receiving all required inspections will not receive final sign-off or Certificate of Occupancy.
Source: Community Development Department, Building Division ↗
Frequently asked
Common questions about Leavenworth permits
01 Do I need a building permit in Leavenworth, WA? ▸
02 How much does a building permit cost in Leavenworth, WA? ▸
03 How do I apply for a building permit in Leavenworth, WA? ▸
04 How long does it take to get a building permit in Leavenworth, WA? ▸
05 How do I schedule a building inspection in Leavenworth, WA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with Community Development Department, Building Division before applying. Jaspector is not legal advice.