On this page 6
When a permit is required
Permit triggers and exempt work for Cashmere
Building permits are required for construction and alterations within the City of Cashmere.
Note: Work exempt per Section 105 of IRC/IBC applies. Contact City Hall to determine specific exemptions.
- Completed building permit application
- Subsurface wastewater disposal permit (if applicable)
- Site plan drawn to approximate scale
- Clear statement of intended property use
- Assigned 911 address
- Access/driveway permit (if required)
- State or Federal permits (if required)
- Building code
- Building codes as adopted by Washington State Building Code Council
- Contractor requirements
- Contractor registration with Washington State Department of Labor and Industries required.
Application process
Typical processing: Varies; contact City Hall for processing timeframes.
- 01 Obtain permit application forms from City Hall (101 Woodring Street, Cashmere, WA 98815)
- 02 Prepare a subsurface wastewater disposal permit (if the structure will have pressurized water), in compliance with Washington State Plumbing Code
- 03 Prepare a site plan drawn to approximate scale showing lot measurements, all buildings, setbacks, disposal fields, abutting streets/ways, and existing/proposed parking
- 04 Provide a clear statement of the intended use of the property
- 05 Assign a 911 address for the property
- 06 Obtain access/driveway permit if required
- 07 Obtain any required State or Federal permits
- 08 Submit completed application and all supporting documents in person or by mail to City Hall
- 09 Pay application fee (fee schedule determined by City Council)
Typical processing time: Varies; contact City Hall for processing timeframes.
Fee schedule
Cashmere building permit fees
All fees must be paid in full at City Hall before permit issuance. No permit shall be issued until all costs are paid.
Required inspections
Scheduling and sequence
- (509) 782-3513 (phone)
- Scheduling deadline
- Contact City Hall to schedule inspections.
- Inspection hours
- Monday-Friday, 8:00 AM to 4:00 PM (or as posted)
Typical sequence: Inspections are conducted by building inspector appointed by City Hall.
Frequently asked
Common questions about Cashmere permits
01 Do I need a building permit in Cashmere, WA? ▸
02 How much does a building permit cost in Cashmere, WA? ▸
03 How do I apply for a building permit in Cashmere, WA? ▸
04 How long does it take to get a building permit in Cashmere, WA? ▸
05 How do I schedule a building inspection in Cashmere, WA? ▸
Educational reference. Permit rules and fees change — confirm current requirements directly with City Hall before applying. Jaspector is not legal advice.